Posted: Mon 25th Nov 2013

Roadworks in and around Flintshire starting today and tomorrow – 25th November

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Monday, Nov 25th, 2013

For the very latest live travel information including traffic and road works in and around Flintshire scroll to the bottom 


A55
25 November — 20 December
Delays likely
Works location: The A55 Eastbound Will Be Closed Between The Junctions With The A5104 And The A483, Due To Roadworks, Between10 Pm And 5 Am, From 25 November 2013 To 20 December 2013.
Works description: –
Responsibility for works: Highways Agency
Current status: Planned work about to start

Upper Aston Hall Lane, Hawarden, Flintshire
25 November — 06 December
Delays likely Road closure
Works location: Outside 37 Upper Aston Hall Road To Junction With Lower Aston Hall Lane
Works description: To Excavate & Install 170 Metres New Cable In Carriageway. To Excavate Joint Bays.Overhead Line Work
Responsibility for works: Scottish Power
Current status: Planned work about to start

A5119 Ruthin Road, Mold, Flintshire
25 November — 06 December
Delays possible
Works location: Feeder Pillar Outside The Ambulance Station Mold
Works description: ‘New Electrical Service To Street Furniture’ ‘The Excavation And Reinstatement Of The Footway For The Connection Of Electrical Supply To Street Furniture.’ Requires A New 32a Supply Into Feeder Pillar
Responsibility for works: Scottish Power
Current status: Planned work about to start

Cornist Drive, Flint, Flintshire
26 November — 27 November
Delays possible Traffic control (give & take)
Works location: 4 Cornist Drive, Flint
Works description: Locate Stop Tap By Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start

Dock Road, Connahs Quay, Flintshire
26 November — 29 November
Delays possible Traffic control (multi-way signals)
Works location: In The Area Of The Bridge-From 10 Metres To 40 Metres South Of The Junction With Quay Lane
Works description: Section Felling Of Trees Pverhanging The Carriageway & Footpath On Approach To Bridge @ Dock Road. 09:00 – 15:00
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning

Mancot Lane, Mancot, Flintshire
25 November — 06 December
Delays possible Traffic control (multi-way signals)
Works location: Jct Mancot Lane & Colliery Lane
Works description: Sewer Requisition
Responsibility for works: Welsh Water
Current status: Planned work about to start

[dciframe]http://roadworks.org/,610,680,0,no,border:0px solid blue;align:left;[/dciframe]

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com
Latest News

  • Flintshire wins share of £100m Welsh Government transport and active travel improvement funding
  • Check if your business is eligible to benefit from grants to help reduce running costs
  • Flint Air Cadets Showcase Skills to Civic Leaders

  • More...

    Flintshire wins share of £100m Welsh Government transport and active travel improvement funding

    News

    Check if your business is eligible to benefit from grants to help reduce running costs

    News

    Flint Air Cadets Showcase Skills to Civic Leaders

    News

    Plans for 25-bedroom dementia unit at a Flintshire care home given green light.

    News

    Former landlord of Deeside pub sentenced to 24 years in prison for rape and sexual assault

    News

    Lidl set to open new Connah’s Quay store in December

    News

    Boss of Deeside based Iceland Foods set to run London Marathon in memory of his mother

    News

    Senedd rejects mandatory Outdoor Education Bill for Welsh schools

    News

    UK shoppers misled by some origin labelling on food in supermarkets, claims Which?

    News