Posted: Mon 25th Nov 2013

Roadworks in and around Flintshire starting today and tomorrow – 25th November

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Monday, Nov 25th, 2013

For the very latest live travel information including traffic and road works in and around Flintshire scroll to the bottom 


A55
25 November — 20 December
Delays likely
Works location: The A55 Eastbound Will Be Closed Between The Junctions With The A5104 And The A483, Due To Roadworks, Between10 Pm And 5 Am, From 25 November 2013 To 20 December 2013.
Works description: –
Responsibility for works: Highways Agency
Current status: Planned work about to start

Upper Aston Hall Lane, Hawarden, Flintshire
25 November — 06 December
Delays likely Road closure
Works location: Outside 37 Upper Aston Hall Road To Junction With Lower Aston Hall Lane
Works description: To Excavate & Install 170 Metres New Cable In Carriageway. To Excavate Joint Bays.Overhead Line Work
Responsibility for works: Scottish Power
Current status: Planned work about to start

A5119 Ruthin Road, Mold, Flintshire
25 November — 06 December
Delays possible
Works location: Feeder Pillar Outside The Ambulance Station Mold
Works description: ‘New Electrical Service To Street Furniture’ ‘The Excavation And Reinstatement Of The Footway For The Connection Of Electrical Supply To Street Furniture.’ Requires A New 32a Supply Into Feeder Pillar
Responsibility for works: Scottish Power
Current status: Planned work about to start

Cornist Drive, Flint, Flintshire
26 November — 27 November
Delays possible Traffic control (give & take)
Works location: 4 Cornist Drive, Flint
Works description: Locate Stop Tap By Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start

Dock Road, Connahs Quay, Flintshire
26 November — 29 November
Delays possible Traffic control (multi-way signals)
Works location: In The Area Of The Bridge-From 10 Metres To 40 Metres South Of The Junction With Quay Lane
Works description: Section Felling Of Trees Pverhanging The Carriageway & Footpath On Approach To Bridge @ Dock Road. 09:00 – 15:00
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning

Mancot Lane, Mancot, Flintshire
25 November — 06 December
Delays possible Traffic control (multi-way signals)
Works location: Jct Mancot Lane & Colliery Lane
Works description: Sewer Requisition
Responsibility for works: Welsh Water
Current status: Planned work about to start

[dciframe]http://roadworks.org/,610,680,0,no,border:0px solid blue;align:left;[/dciframe]

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com
Latest News

  • North Wales MS calls for improved mental health support for parents
  • Synthite Fire: Pollution levels in River Alyn now “safe,” says Natural Resources Wales
  • North Wales Rural Crime Team leads pioneering dog DNA project to stop livestock attacks

  • More...

    North Wales MS calls for improved mental health support for parents

    News

    Synthite Fire: Pollution levels in River Alyn now “safe,” says Natural Resources Wales

    News

    North Wales Rural Crime Team leads pioneering dog DNA project to stop livestock attacks

    News

    Former Mold chapel could be converted into five apartments

    News

    NHS 111 Wales launches pioneering new contact centre technology

    News

    Countess of Chester Hospital consultant running Chester Half Marathon for her workplace after shedding almost 10 stone

    News

    “Plaid Cymru has ended its Co-operation agreement with the Welsh Government with immediate effect”

    News

    Appeal launched after plans for Christmas tree farm and reindeer centre near Wrexham/Flintshire border refused

    News

    Operation Sceptre: Flintshire Police to carry out ‘knife sweep’ of Wepre Park

    News