Posted: Tue 28th Jan 2014

Roadworks In And Around Deeside starting from 28/01/14

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Tuesday, Jan 28th, 2014

[followbutton username=’deesidedotcom’]

Roadworks In And Around Deeside from 22/01/14

Chester Road : 16 weeks of roadworks to start Monday 20th JanuaryClick Here for more

River Lane, Saltney, Flintshire
28 January — 28 January
Delays possible Traffic control (Stop/Go boards)
Works location: In The Area Of The Bridge-From 120 Metres To 165 Metres North Of The Junction With Chester Street
Works description: Half Road Closure With Stop/Go Signs Required To Erect Bridge Strike Signs 28/01/2014 – 1000 28/01/2014 – 1700
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning

A494 A494 Gwegl Y Bryn To Craig Lelo Works Jct, Bryn Saith Marchog, Corwen, Denbighshire
29 January — 29 January
Delays likely Traffic control (Stop/Go boards)
Works location: A494 Wrth/ Nr Ysgubor Ddegrwm…
Works description: Amnewid Arwyddion/ Replace Signs…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning

A494t Ruthin Road, Gwernymynydd, Flintshire
28 January — 31 January
Delays likely Traffic control (multi-way signals)
Works location: A494 Ruthin Road Jnc With Hafod Road Gwernymynydd Flintshire Ch7 4as
Works description: To Access Underground Network No Excavation
Responsibility for works: BT
Current status: Planned work about to start
A51 Boughton, Chester, Cheshire West And Chester
28 January — 30 January
Delays likely Traffic control (give & take)
Works location: Jnc Boughton
Works description: Interim To Perm Works In Footway And Carriageway
Responsibility for works: National Grid Gas Plc
Current status: Advanced planning
A540 Parkgate Road, Chester, Cheshire West And Chester
28 January — 30 January
Delays likely Traffic control (give & take)
Works location: Works Outside Number 325 In Footway
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

A540 Parkgate Road, Saughall, Chester, Cheshire West And Chester
29 January — 31 January
Delays likely Traffic control (two-way signals)
Works location: A540 Parkgate Road From R/About Woodside Fm To Jcn With Long Lane
Works description: 2 Way Manned T/Lights Req. For Bt Openreach Cabling Ops In Existing Duct On A540 Parkgate Road Northern Verge.50 Mph Posted,Total Length Of Road Concerned Is 650 Metres.
Responsibility for works: BT
Current status: Advanced planning
River Lane, Lache, Chester, Cheshire West And Chester
28 January — 28 January
Delays likely Traffic control (Stop/Go boards)
Works location: In The Area Of The Bridge-From 120 Metres To 165 Metres North Of The Junction With Chester Street
Works description: Half Road Closure With Stop/Go Signs Required To Erect Bridge Strike Signs 28/01/2014 – 1000 28/01/2014 – 1700
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: [email protected]
Latest News

  • Shotton’s Deeside Home Care in Top 20 for 2024
  • Fifteen flintshire families receive support ‘love from Anwyl’
  • Police seek help for Shotton pedestrian incident

  • More...

    Shotton’s Deeside Home Care in Top 20 for 2024

    News

    Fifteen flintshire families receive support ‘love from Anwyl’

    News

    Police seek help for Shotton pedestrian incident

    News

    Burglars steal collection box from Flintshire church

    News

    Chester Zoo bids farewell to beloved Chimpanzee Boris who has died aged 58

    News

    Flintshire Council’s three-weekly bin collection ‘called-in’ by opponents

    News

    Planning: 24-bedroom golf lodge approved for Northop Country Park

    News

    Good news for Broughton wingmakers – flynas seals major deal with Airbus for 90 new jets

    News

    Senedd to be recalled from summer break to nominate new First Minister on 6th August

    News