A494t Ruthin Road, Gwernymynydd, Flintshire
11 December — 13 December
Delays likely Traffic control (two-way signals)
Works location: Ruthin Road, Gwernymynydd,
Works description: Provide Fibre Cable In Existing Ductway Using 2 Way Lights
Responsibility for works: BT
Current status: Planned work about to start

A5119 Ruthin Road, Mold, Flintshire
11 December — 12 December
Delays likely Traffic control (give & take)
Works location: Llys Awel, Ruthin Road, Mold
Works description: House Hold Meter Option – Fit
Responsibility for works: Welsh Water
Current status: Planned work about to start

A541 Mold Road, Caergwrle, Flintshire
11 December — 13 December
Delays likely Traffic control (two-way signals)
Works location: Works Outside Tan-Y-Coed Number 13 In Footway
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start

A550 Hawarden Road, Hope, Flintshire
12 December — 13 December
Delays likely Traffic control (two-way signals)
Works location: 15 Hawarden Road, Hope
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

A55
11 December — 12 December
Delays possible Lane closure
Works location: A55, A55 Welsh Border To A483 East & Westbound.
Works description: N – Overnight Total Closures East & Westbound Due To Scheme Works
Responsibility for works: Highways Agency
Current status: Planned work about to start

Bryn Coch Lane, Mold, Flintshire
12 December — 16 December
Delays possible Traffic control (give & take)
Works location: In Footway Outside Parkside, Bryn Coch Lane
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Planned work about to start

Saughall Road, Chester, Cheshire West And Chester
11 December — 13 December
Delays possible Traffic control (give & take)
Works location: 79 Saughall Road, Chester, Cheshire West & Cheshire
Works description: Dig Down On Sewer Repair
Responsibility for works: Welsh Water
Current status: Advanced planning

Central Drive, Shotton, Flintshire
11 December — 16 December
Delays possible Traffic control (two-way signals)
Works location: Pcp 43 Adjacent To 34
Works description: Excavate 10 Metre Track In Grass, Excaavte 1 Metre Track In Footway, Excavate Joint Bay In Footway. Install Duct
Responsibility for works: Scottish Power
Current status: Planned work about to start

Drury New Road, Buckley, Flintshire
11 December — 12 December
Delays possible Traffic control (two-way signals)
Works location: Outside Benbradagh
Works description: Overhead Line Work
Responsibility for works: Scottish Power
Current status: Planned work about to start

High Street, Saltney, Flintshire
11 December — 13 December
Delays possible
Works location: Outside Border House Opposite 26
Works description: Excavate & Reinstate Joint Bay In Footway & 1 Metre Track. Pull Approximately 30 Metres Cable Through Customer Installed Duct.
Responsibility for works: Scottish Power
Current status: Planned work about to start

Penymynydd Road, Penymynydd, Flintshire
11 December — 16 December
Delays possible
Works location: Feeder Pillar Outside Ivy Cottage Flintshire
Works description: ‘New Electrical Service To Street Furniture’ ‘The Excavation And Reinstatement Of The Footway For The Connection Of Electrical Supply To Street Furniture.’
Responsibility for works: Scottish Power
Current status: Planned work about to start

[dciframe]http://roadworks.org/,610,600,0,no,border:0px solid blue;align:left;[/dciframe]

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: [email protected] Latest News

  • Drug gang’s sentences increased after Deeside farm used in £250m cocaine operation
  • Bird flu outbreak: New rules for bird keepers over the border in Cheshire
  • Airbus Broughton launches STEM programme with local schools

  • More...

    Drug gang’s sentences increased after Deeside farm used in £250m cocaine operation

    News

    Bird flu outbreak: New rules for bird keepers over the border in Cheshire

    News

    Airbus Broughton launches STEM programme with local schools

    News

    Doctor warns of rising scurvy cases among children in Wales

    News

    High-achieving medical student pursuing her passion wins school science prize

    News

    Flintshire manufacturer appoints new directors to drive business

    News

    Ultra-processed food driving ‘diabetes epidemic,’ Senedd told

    News

    Two Flintshire schools receive national prizes for nature projects

    News

    Saltney: Petition launched to save St Anthony’s Catholic Primary School from closure

    News