A5104 Corwen Road, Pontybodkin, Flintshire |
04 June — 06 June |
Delays likely Traffic control (multi-way signals) |
Works location: From 20 Metres North Of The Lodge To 90 Metres South Of The Lodge |
Works description: Overhead Line Work |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
|
|
Capenhurst Lane, Capenhurst, Chester, Cheshire West And Chester |
04 June — 04 June |
Delays likely Traffic control (Stop/Go boards) |
Works location: From 1 Oktree Cottages To The Limes |
Works description: Tree Cutting Around The Overhead Network Under Outage Conditions |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
Ffordd Y Llan, Treuddyn, Flintshire |
03 June — 12 June |
Delays likely Traffic control (two-way signals) |
Works location: Pcp 2 Side Of Berea Chapel |
Works description: Excavate Road Crossing, Joint Bay In Verge To Feed New Bt Cabinet |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
George Street, Chester, Cheshire West And Chester |
03 June — 04 June |
Delays likely Traffic control (multi-way signals) |
Works location: Chester: Site 6020, George St/Canal St, Chester. Usrn 06900709: George Street / Canal Street:; Peter Smith |
Works description: Install Free Issue Led Equipment At Site 6020 Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Lower Aston Hall Lane, Hawarden, Flintshire |
04 June — 06 June |
Delays likely Road closure |
Works location: 32 Lower Aston Hall Lane, Hawarden, Deeside |
Works description: Renew Service |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Willowdale Way, Great Sutton, Ellesmere Port, Cheshire West And Chester |
03 June — 10 June |
Delays likely Traffic control (two-way signals) |
Works location: Approximately 10m From The Junction Of Silverbirch Way |
Works description: Track Exc Avation To Install Duct And Build Associated Duct Access Chambers |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
A549 Mold Road, Buckley, Flintshire |
03 June — 06 June |
Delays possible Traffic control (give & take) |
Works location: O/S Plot Adj To Isfryn |
Works description: Lay New Service – 3m Public 13m Private |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
A550 The Highway, Hawarden, Flintshire |
03 June — 04 June |
Delays possible Traffic control (two-way signals) |
Works location: O/S No.88 |
Works description: Replacing Temporary Reinstatement With Permanent |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
B5441 Welsh Road, Garden City, Flintshire |
04 June — 09 June |
Delays possible Traffic control (two-way signals) |
Works location: O/S No.88 |
Works description: Lay New Service – 5m Public 15m Private |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
Brick Road, Bretton, Flintshire |
03 June — 05 June |
Delays possible Traffic control (two-way signals) |
Works location: From Junct Lesters Lane & Brick Road To Approx.212m From Bretton Lodge Farm(Heading Towards Lower Kinnerton), Brick Road |
Works description: Install Sub-Duct Into Existing Bt Duct And Route Prove Duct Sections- No Excavation |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
|
|
Kinnerton Road, Lower Kinnerton, Chester, Cheshire West And Chester |
04 June — 06 June |
Delays possible Traffic control (two-way signals) |
Works location: Near Telephone Exchange To Outside Smithy Cottages, Kinnerton Road |
Works description: Install Sub-Duct Into Existing Bt Duct And Route Prove Duct Sections- No Excavation |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Hoole Lane, Chester, Cheshire West And Chester |
04 June — 06 June |
Delays possible Traffic control (give & take) |
Works location: Works At The Rear Of 1 And 3 Cross Street In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Cliveden Road, Chester, Cheshire West And Chester |
03 June — 05 June |
Delays possible Traffic control (give & take) |
Works location: Works Outside Number 111 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Constitution Hill, Leeswood, Flintshire |
04 June — 06 June |
Delays possible Traffic control (multi-way signals) |
Works location: From The Junction With Corwen Road To 90 Metres West |
Works description: Overhead Line Work |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Plas Y Mhowys Jct To Pen Y Groes Jct, Treuddyn, Flintshire |
03 June — 05 June |
Delays possible Traffic control (two-way signals) |
Works location: Works Adjacent To Property ‘Pen Y Groes’ In Carriageway & Grass Verge |
Works description: Install New Connection From Main To Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
Rectory Lane, Capenhurst, Chester, Cheshire West And Chester |
04 June — 04 June |
Delays possible Traffic control (Stop/Go boards) |
Works location: Near Junction With Manorfield Close To Junction With Capenhurst Lane |
Works description: Tree Cutting Around The Overhead Network Under Outage Conditions |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
Upton Lane, Upton, Chester, Cheshire West And Chester |
04 June — 06 June |
Delays possible Traffic control (give & take) |
Works location: In Road At Junction With Liverpool Road, Upton Lane, Upton, Chester, Chester West And Chester. |
Works description: Installation Of Cello. |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
|
|