A5119 A5119 Bryn Awelon County Hall Lights, Mold, Flintshire |
18 June — 20 June |
Delays likely Traffic control (give & take) |
Works location: A5119, From O/S Shire Hall Council Offices Of Flintshire County Council To Jnc Of Raikes Lane |
Works description: Bt Rolling Works, Cable Recovery Works Only, No Excavation. |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A5119 County Hall Lights To Start Of Dual, Mold, Flintshire |
18 June — 20 June |
Delays likely Traffic control (give & take) |
Works location: A5119, From End Of Dual C/Way Section Of A5119 To O/S Rose Cottage |
Works description: Bt Rolling Works, Cable Recovery Works Only, No Excavation. |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A541 Mold Road, Caergwrle, Flintshire |
18 June — 20 June |
Delays likely Traffic control (two-way signals) |
Works location: Works Outside Number 15 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
A541 Wrexham Road, Caergwrle, Flintshire |
18 June — 20 June |
Delays likely Traffic control (two-way signals) |
Works location: Footway Outside Post Office, Wrexham Road |
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Replace 1 Jointbox Frame And Cover(S) (1310mm X 610mm) In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A541 Wrexham Road, Cefn-Y-Bedd, Flintshire |
19 June — 23 June |
Delays likely Traffic control (give & take) |
Works location: Works Outside Property ‘Wingerworth’ In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
A548 Sealand Road, Chester, Cheshire West And Chester |
19 June — 20 June |
Delays likely Traffic control (multi-way signals) |
Works location: Chester: Site 6046, Sealand Rd/Stadium Way, Chester. Usrn 65901548: Sealand Rd/Stadium Way:; Peter Smith |
Works description: Install Free Issue Led Traffic Signal Equipment At Site 6046 Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
A549 Mold Road, Buckley, Flintshire |
19 June — 30 June |
Delays likely Traffic control (two-way signals) |
Works location: Plot Adjacent To Isfryn |
Works description: Excavate & Reinstate Service Breech Joint Bay In Footway, 6 Metre Road Crossing, 2 Metre Track In Footway, Install Ducts |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Capenhurst Lane, Capenhurst, Chester, Cheshire West And Chester |
18 June — 25 June |
Delays likely Traffic control (two-way signals) |
Works location: Approximately 125m From Farm Meadow |
Works description: Track Excavation To Install Duct And Build Associated Duct Access Chambers |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
Church Street, Flint, Flintshire |
19 June — 23 June |
Delays likely Traffic control (multi-way signals) |
Works location: Abc123, In Footway Outside Library To Carriageway In Jcn With Swinciard Lane, Church Street |
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
Green Lane, Marlston Cum Lache, Chester, Cheshire West And Chester |
18 June — 19 June |
Delays likely Traffic control (two-way signals) |
Works location: Structure 46 |
Works description: Trial Holes / Excavation On Grass Verge To Ascertain The Condition Of The Bridge Deck On Structure No.46 On The Bks With Two Way Traffic Lights (Which Will Be Swapped From One Lane To The Other When Necessary, And Removed Out Of Shifts) Will Be Required Between 0930 And 1530 For 2 Days. However, A Concrete Incursion Barrier Is Required To Remain On Site Continuously During The Works From 0930 On 18/06/14 Until 1530 On 19/06/14 |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
|
Nant Mawr Road, Buckley, Flintshire |
19 June — 23 June |
Delays likely Traffic control (two-way signals) |
Works location: O/S 34 |
Works description: Dig Down Repair |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
St John Street, Chester, Cheshire West And Chester |
18 June — 19 June |
Delays likely Traffic control (multi-way signals) |
Works location: Chester: Site 6115, A5268/Little St John Street, Chester. Usrn 06901035: Little St John Street To Foregate Street:; Pete |
Works description: Install Free Issue Led Traffic Signal Equipment At Site 6115. Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
A5119 Northop Road, Flint, Flintshire |
18 June — 27 June |
Delays possible Some carriageway incursion |
Works location: Bt Cabinet, Adjacent Car Park |
Works description: Excavate Track To Overhead Pole In Footway |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
B5127 Mold Road, Ewloe Green, Flintshire |
19 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: In Verge, Opposite Horbeth, Mold Road |
Works description: Recover 1 Existing Pole |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B5127 Mold Road, Ewloe Green, Flintshire |
19 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: In Verge, At Junction Of Drive To Yelva Cottages, Mold Road |
Works description: Provide 1 New Pole |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B5129 Saltney Ferry Road, Saltney Ferry, Flintshire |
18 June — 19 June |
Delays possible Traffic control (give & take) |
Works location: 336909 364809 In Verge Opposite The Yews On Saltney Ferry Road, Saltney Ferry Road |
Works description: Replace 1 Existing Pole |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
Broughton Hall Road, Broughton, Flintshire |
18 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: Junction Of Church Road To Outside Number 131 In Carriageway Nad Verge |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Lay New Water Main – Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access. |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
Lache Lane, Chester, Cheshire West And Chester |
18 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: Outside 147 On Lache Lane, Chester |
Works description: Replace 1 Existing Pole |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Lache Lane, Chester, Cheshire West And Chester |
19 June — 23 June |
Delays possible Traffic control (give & take) |
Works location: Works Outside Number 151 |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Carry Out Disconnection Of Old Service At Boundary To Main (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Greenfields Drive, Little Neston, Neston, Cheshire |
18 June — 15 July |
Delays possible Some carriageway incursion |
Works location: 41 Greenfields Drive, Neston, Ch64 0ty |
Works description: Skip Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Work in progress |
|
|
Melbourne Road, Chester, Cheshire West And Chester |
19 June — 25 June |
Delays possible Traffic control (give & take) |
Works location: Blacon: Col: 1: At / Outside House Trinity Chu:; Laurence Scott |
Works description: Replace Concrete Column Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Newhall Road, Chester, Cheshire West And Chester |
19 June — 23 June |
Delays possible Traffic control (give & take) |
Works location: Adjacent To 5 New Hall Road |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Lay New Water Main – Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Predestrain Access |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Newhall Road, Upton, Chester, Cheshire West And Chester |
18 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: Works Outside Flats 33/37/41 In Verge |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Renew Defective Stop Tap (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Newhall Road, Upton, Chester, Cheshire West And Chester |
18 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: Works Opposite ‘Sub Station’ In Verge |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Renew Defective Stop Tap (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Upton Lane, Upton, Chester, Cheshire West And Chester |
18 June — 20 June |
Delays possible Traffic control (give & take) |
Works location: On Upton Lane At Junction With Liverpool Road, Upton, Chester, Cheshire West And Chester. |
Works description: Installation Of Cello. |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|