A5119 Northop Road, Northop, Flintshire |
20 January — 30 January |
Delays likely Traffic control (two-way signals) |
Works location: Opp Gas Pumping Station On A5119 Northop Road Through Village To Junc Connahs Quay Rd Northop Flintshire Ch7 6br |
Works description: 2 Way Rolling Lights Required To Enable Safeaccess To Bt Chambers For Bduk Delivery. Lights Will Be Manned At All Times 0900-1530hrs. Approx 1000metres ***No Excavation**** |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A540 Parkgate Road, Chester, Cheshire West And Chester |
20 January — 22 January |
Delays likely Traffic control (give & take) |
Works location: Works Outside Number 325 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
A548 Chester Road, Flint, Flintshire |
20 January — 21 January |
Delays likely Traffic control (give & take) |
Works location: O/S The Willows |
Works description: Replacing Temporary Tarmac With Permanent |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
A548 Sealand Road, Chester, Cheshire West And Chester |
20 January — 31 January |
Delays likely Traffic control (two-way signals) |
Works location: Blacon: At Existing Crossing – Near Vernon St: Stadium Way To South View Road |
Works description: Civils Works To Facilitate New Puffin Crossing Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Broughton Hall Road, Broughton, Flintshire |
20 January — 14 February |
Delays likely Road closure |
Works location: Between Its Junctions With Church Road And Wynnstay Road |
Works description: Water Mains Renewal With Association Works |
Responsibility for works: Flintshire County Council |
Current status: Advanced planning |
|
|
Broughton Hall Road, Broughton, Flintshire |
20 January — 14 February |
Delays likely Road closure |
Works location: Junction Of Church Road To Outside Number 131 In Carriageway Nad Verge |
Works description: Lay New Water Main – Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access. |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
High Street, Connahs Quay, Flintshire |
21 January — 24 January |
Delays likely Traffic control (two-way signals) |
Works location: Between No’S 371 & 375 |
Works description: Lay New Service – 19m Public |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
Main Road, Higher Kinnerton, Flintshire |
20 January — 22 January |
Delays likely Traffic control (two-way signals) |
Works location: Works Opposite ‘The Hall’ In Footway/Chamber |
Works description: Works In Chamber – No Excavation.Traffic Lights For Safe Working Practices (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access. |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
A548 Sealand Road, Sealand, Flintshire |
20 January — 20 January |
Delays possible Traffic control (two-way signals) |
Works location: O/S Home Farm On Sealand Rd Sealand Flintshire Ch5 2lq |
Works description: Engineering Access Required With A Hoist In Attendance To Bt Overhead Network To Install An Overhead Dropwire Cable To Repair Customer Telephone Service. No Excavations. Bt Customer Fault Wn6jfy16 Refers |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B5373 Gresford Road, Hope, Flintshire |
21 January — 23 January |
Delays possible Traffic control (multi-way signals) |
Works location: From Outside Sandbanks To 50 Metres North Of Bodhyfryn |
Works description: Renew Cable. Renew 2 X Stay Wires. Reconnect Underground Services X 2. Fit Service Box. Install 1 X Stay. Reconnect Overhead Services |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Hermitage Road, Saughall, Chester, Cheshire West And Chester |
21 January — 23 January |
Delays possible Traffic control (give & take) |
Works location: Outside Number 86 |
Works description: Open Cut Excavation Required To Install Stop Tap That Is Causing A Potential Hazard, On Behalf Of United Utilities. In Carriageway. |
Responsibility for works: United Utilities Water |
Current status: Advanced planning |
|
|
Eaton Road, Chester, Cheshire West And Chester |
20 January — 22 January |
Delays possible Traffic control (give & take) |
Works location: Works Outside Number 32 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Welsh Road, Marlston Cum Lache, Chester, Cheshire West And Chester |
20 January — 22 January |
Delays possible |
Works location: Junction Of Rough Hill And A483 |
Works description: Excavate To Standard Depth, Open Cut In Verge Track In Verge For Street Lighting Feeder Pillar Transfer/Reservice For Underground Electrical Service Connection. Followed By A Permanent Reinstatement. |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
Church Road, Broughton, Flintshire |
20 January — 31 January |
Delays possible Traffic control (multi-way signals) |
Works location: Junction Of Church Road And Broughton Hall Road In Carriageway |
Works description: Lay New Water Main – Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access. |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
Circular Drive, Chester, Cheshire West And Chester |
20 January — 22 January |
Delays possible Traffic control (give & take) |
Works location: Works Outside Number 36 In Grass Verge |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Higher Common Close, Buckley, Flintshire |
21 January — 23 January |
Delays possible Traffic control (two-way signals) |
Works location: The Brambles 1 Higher Common Cloase, Buckley |
Works description: Renew Stop Tap |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Kiln Lane, Hope, Flintshire |
21 January — 22 January |
Delays possible Traffic control (multi-way signals) |
Works location: From The Junction With Gresford Road To 10 Metres West Of The Junction |
Works description: Overhead Line Work |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Shotton Lane, Shotton, Flintshire |
21 January — 27 January |
Delays possible Traffic control (multi-way signals) |
Works location: Junction With Green Lane |
Works description: Excavate In Footway To Change 4 Way Linkbox. |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Upton Lane, Upton, Chester, Cheshire West And Chester |
20 January — 20 January |
Delays possible Traffic control (Stop/Go boards) |
Works location: Outside 17 |
Works description: Tree Cutting Around The Overhead Network |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
West Vale, Neston, Cheshire West And Chester |
21 January — 23 January |
Delays possible Traffic control (give & take) |
Works location: In Footway Outside 80 West Vale, Neston, West Vale |
Works description: Build 1 Precast Jointing Chamber(S) (350mm X 200mm) 300mm |
Responsibility for works: BT |
Current status: Advanced planning |
|