A494t Ruthin Road, Gwernymynydd, Flintshire |
11 December — 13 December |
Delays likely Traffic control (two-way signals) |
Works location: Ruthin Road, Gwernymynydd, |
Works description: Provide Fibre Cable In Existing Ductway Using 2 Way Lights |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A5119 Ruthin Road, Mold, Flintshire |
11 December — 12 December |
Delays likely Traffic control (give & take) |
Works location: Llys Awel, Ruthin Road, Mold |
Works description: House Hold Meter Option – Fit |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
A541 Mold Road, Caergwrle, Flintshire |
11 December — 13 December |
Delays likely Traffic control (two-way signals) |
Works location: Works Outside Tan-Y-Coed Number 13 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
A541 Wrexham Road, Cefn-Y-Bedd, Flintshire |
10 December — 11 December |
Delays likely Traffic control (multi-way signals) |
Works location: At The Railway Bridge (Rail Over Road Bridge No.16) |
Works description: Works To Facilitate Correction To Installation Of Bridge Strike Cctv Monitoring System At The Railway Bridge (Wdb1/16). Using An Aluminium Tower To Access The Underside Of The Bridge. Works Taking Place 21:00 Tuesday 10th December To06:00 Wednesday 11th December |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
|
Mount Pleasant Road, Drury, Flintshire |
10 December — 12 December |
Delays likely Road closure |
Works location: Between Its Junctions With Drury Lane And Burntwood Road |
Works description: Water Connection With Associated Works |
Responsibility for works: Flintshire County Council |
Current status: Planned work about to start |
|
|
A55 |
10 December — 11 December |
Delays possible Lane closure |
Works location: A55, A55 Welsh Border To A483 East & Westbound. |
Works description: N – Overnight Total Closures East & Westbound Due To Scheme Works |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
Saughall Road, Chester, Cheshire West And Chester |
10 December — 12 December |
Delays possible Traffic control (give & take) |
Works location: Works Between Numbers 228 And 230 In Flagged Footway |
Works description: Replace Defective Casings And Lids (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Saughall Road, Chester, Cheshire West And Chester |
11 December — 13 December |
Delays possible Traffic control (give & take) |
Works location: 79 Saughall Road, Chester, Cheshire West & Cheshire |
Works description: Dig Down On Sewer Repair |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
Overleigh Road, Chester, Cheshire West And Chester |
10 December — 12 December |
Delays possible |
Works location: Opposite Junction River Lane,Chester |
Works description: To Undertale Permanent Reinstatement In Footway |
Responsibility for works: Vodafone Group |
Current status: Advanced planning |
|
|
Central Drive, Shotton, Flintshire |
11 December — 16 December |
Delays possible Traffic control (two-way signals) |
Works location: Pcp 43 Adjacent To 34 |
Works description: Excavate 10 Metre Track In Grass, Excaavte 1 Metre Track In Footway, Excavate Joint Bay In Footway. Install Duct |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Drury New Road, Buckley, Flintshire |
11 December — 12 December |
Delays possible Traffic control (two-way signals) |
Works location: Outside Benbradagh |
Works description: Overhead Line Work |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Foxglove Close, Huntington, Chester, Cheshire West And Chester |
10 December — 12 December |
Delays possible Traffic control (multi-way signals) |
Works location: Junction Of Foxglove Close And Caldey Valley Road, Huntington |
Works description: Renew Frame And Cover |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
Gwernaffield Rd To Bryn Garmon Jct, Gwernaffield, Flintshire |
10 December — 16 December |
Delays possible Traffic control (two-way signals) |
Works location: Gwernaffield Rd To Bryn Garmon Jct |
Works description: Provide Cable In Extisting Ductway Along Gwernaffield Road To The Bryn Garmon Jct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
High Street, Saltney, Flintshire |
11 December — 13 December |
Delays possible |
Works location: Outside Border House Opposite 26 |
Works description: Excavate & Reinstate Joint Bay In Footway & 1 Metre Track. Pull Approximately 30 Metres Cable Through Customer Installed Duct. |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Mount Pleasant Road, Drury, Flintshire |
10 December — 16 December |
Delays possible Traffic control (Stop/Go boards) |
Works location: At The Side Of 57 Burntwood Road |
Works description: Excavate Joint Bay In Footway, Excavate Trench Across The Rad, Lay Ducting. Reinstate |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Penymynydd Road, Penymynydd, Flintshire |
11 December — 16 December |
Delays possible |
Works location: Feeder Pillar Outside Ivy Cottage Flintshire |
Works description: ‘New Electrical Service To Street Furniture’ ‘The Excavation And Reinstatement Of The Footway For The Connection Of Electrical Supply To Street Furniture.’ |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|