A51 Vicars Cross Road, Great Boughton, Chester, Cheshire West And Chester |
16 January — 16 January |
Delays likely Traffic control (two-way signals) |
Works location: O/S 5 Vicars Cross Road Great Broughton Chester Cheshire Ch3 5pl |
Works description: The Opening Of A Carriageway Structure To Allow Jointing Works To An Underground Telecoms Cable. No Excavations. |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
|
|
A541 High Street, Caergwrle, Flintshire |
15 January — 17 January |
Delays likely Traffic control (give & take) |
Works location: O/S The Spar |
Works description: Service Disconnection – 1m Public |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
A547 Gronant Road, Prestatyn, Denbighshire |
16 January — 17 January |
Delays likely Traffic control (two-way signals) |
Works location: Os 11 & 13 |
Works description: Gwaith Bt/ Bt Works |
Responsibility for works: Denbighshire County Council |
Current status: Advanced planning |
|
|
A547 Gronant Road, Prestatyn, Denbighshire |
16 January — 20 January |
Delays likely Traffic control (two-way signals) |
Works location: In Footway Outside 11/13 Gronant Road, Gronant Road… |
Works description: Replace 1 Existing Pole 0.5m X 0.5m… |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
A557 Clifton Road, Runcorn, Halton |
15 January — 15 January |
Delays likely Traffic control (two-way signals) |
Works location: In The Area Of The Bridge-From 150 Metres To 215 Metres North West Of The Junction With Sutton Causeway |
Works description: Half Road Closure Application For The Examination Of Structure Elr (Chw1 Bridge 54) Required For Wednesday 15th January 2014 08:00 To 16:00 Hrs |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
|
A5 Berwyn Street, Llangollen, Denbighshire |
16 January — 17 January |
Delays likely Traffic control (two-way signals) |
Works location: O/S Vet |
Works description: Replace Temporary Reinstatement With Permanent& Repairs To Defective Reinstatement (Wwu Ref: 12952)… |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
B5118 West Parade, Rhyl, Denbighshire |
15 January — 17 January |
Delays likely Traffic control (give & take) |
Works location: 24 West Parade, Rhyl |
Works description: Disconnect Service At Ferrule… |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
B5132 Sutton Way, Great Sutton, Ellesmere Port, Cheshire West And Chester |
16 January — 16 January |
Delays likely Traffic control (two-way signals) |
Works location: Ellesmere Port: Col: S3: Almost Opp Col10 |
Works description: Call To Damaged O/B/Replace Beacon And 2 Bollards Ellesm |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
B5134 Hinderton Road, Neston, Cheshire West And Chester |
15 January — 17 January |
Delays likely Traffic control (give & take) |
Works location: From Opposite 44 Hinderton Road To Outside Highfields House Hinderton Road, Hinderton Road |
Works description: Locate And Excavate 1 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
|
|
B5394 Fluin Lane, Frodsham, Cheshire West And Chester |
15 January — 17 January |
Delays likely Traffic control (give & take) |
Works location: In Footway Outside 85, Fluin Lane |
Works description: Install 8m Of 1 Way Poly Duct In Footway |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
B5463 Rossmore Road East, Ellesmere Port, Cheshire West And Chester |
15 January — 17 January |
Delays likely Traffic control (give & take) |
Works location: Approx 60m South West From Junction Of Jacks Wood Avenue To Approx 70m East From Outside Garage To Location All On Rossm |
Works description: Locate And Excavate 1 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
High Street, Tattenhall, Chester, Cheshire West And Chester |
16 January — 20 January |
Delays likely Traffic control (two-way signals) |
Works location: Junction Of Church Bank |
Works description: Open Cut Excavation Required To Repair Or Replace Existing Chamber That Is Causing A Potential Hazard, On Behalf Of United Utilities. In Carriageway |
Responsibility for works: United Utilities Water |
Current status: Advanced planning |
|
|
High Street, Rhuddlan, Rhyl, Denbighshire |
15 January — 31 January |
Delays likely Traffic control (two-way signals) |
Works location: From The Bridge To The Mini Roundabout… |
Works description: Trwsio’S Lon Gerbydau/ Carriageway Repairs… |
Responsibility for works: Denbighshire County Council |
Current status: Advanced planning |
|
|
M53 |
15 January — 20 January |
Delays likely |
Works location: The M53 Northbound Entry Slip At Junction J5 Will Be Closed , Due To Roadworks, Between 10 Pm And 5 Am, From 15 January 2014 To 20 January 2014. |
Works description: – |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
M56 |
15 January — 16 January |
Delays likely |
Works location: The M56 Eastbound Entry Slip At Junction J14 Will Be Closed , Due To Roadworks, From 10 Pm On 15 January 2014 To 5 Am On 16 January 2014. |
Works description: – |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
|
|
A5026 A5026 Victoria Park Jct To Coleshill Street, Holywell, Flintshire |
15 January — 17 January |
Delays possible Traffic control (two-way signals) |
Works location: Verge, Outside Stoneleigh House To 185 Meters East From Junction Old Bagillt Road On A5026 Victoria Park Jct To Coleshil |
Works description: Locate And Excavate 1 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A5026 A5026 Victoria Park Jct To Coleshill Street, Holywell, Flintshire |
15 January — 17 January |
Delays possible Traffic control (two-way signals) |
Works location: Verge, 350 Meters East From Junction Of Old Bagillt Road To 985 Meters West From Junction Of Victoria Park On A5026 Vict |
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A5026 Fron Park Road, Holywell, Flintshire |
15 January — 16 January |
Delays possible Traffic control (two-way signals) |
Works location: Peace Haven To 7 |
Works description: Overhead Line Work |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
A5036 |
15 January — 15 January |
Delays possible Lane closure |
Works location: A5036, A5036 Bridge Road Roundabout. |
Works description: D – Daytime Lane Closure On Roundabout & Approaches |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
A5117 Dunkirk Way, Backford, Chester, Cheshire West And Chester |
16 January — 20 January |
Delays possible |
Works location: In Grass Verge Opposite Junction Wth Dunkirk Lane |
Works description: Install New Water Connection Off Existing Main |
Responsibility for works: United Utilities Water |
Current status: Advanced planning |
|
|
A5151 Newmarket Road, Dyserth, Rhyl, Denbighshire |
15 January — 17 January |
Delays possible Traffic control (two-way signals) |
Works location: Trelogan Road/High St Dyserth Ll18 6bs… |
Works description: 2 Way Lights Are Required For Access To The Underground Network… |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
A543 Smithfield Road, Denbigh, Denbighshire |
15 January — 16 January |
Delays possible Traffic control (two-way signals) |
Works location: Opp 8 |
Works description: Gwaith Bt/ Bt Works |
Responsibility for works: Denbighshire County Council |
Current status: Advanced planning |
|
|
A543 Smithfield Road, Denbigh, Denbighshire |
15 January — 17 January |
Delays possible Traffic control (two-way signals) |
Works location: Road |
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Foo… |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
A548 Watergate Street, Chester, Cheshire West And Chester |
16 January — 29 January |
Delays possible Traffic control (give & take) |
Works location: (Pcp11) 340511,366273 340500,366275 Side Of Beresford Adamsthe Cross Into Carriagrway On Watergate Street Chester Ches |
Works description: Install 4m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Carriageway,Provide 1 Cabinet And Base (Nga Cabinets) |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
|
|
|
|
Bosworth Road, St Helens, St Helens Council |
15 January — 17 January |
Delays possible |
Works location: Outside 18 |
Works description: Trace, Then Excavate To Repair Gas Escape And Reinstate Where Possible… |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
Bosworth Road, St Helens, St Helens Council |
15 January — 17 January |
Delays possible |
Works location: 105 |
Works description: Gang To Carry Out Defect Repair At Depth Of Under 1.5 Metres By Minimum Dig With Permanent Reinstate… |
Responsibility for works: United Utilities Water |
Current status: Planned work about to start |
|
|
|
Eaton Road, Chester, Cheshire West And Chester |
16 January — 16 January |
Delays possible |
Works location: Eaton Road Outside 21 |
Works description: Section 50 Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Lower Bridge Street, Chester, Cheshire West And Chester |
15 January — 15 January |
Delays possible Traffic control (give & take) |
Works location: Chester: Col: 10: Side Of Cross Keys P/H |
Works description: Fit Client S/Hand Column And Re-Use Existing Lantern Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Cinder Hill, Whitegate, Winsford, Cheshire West And Chester |
16 January — 20 January |
Delays possible Traffic control (give & take) |
Works location: Junction With Whitegate Lane |
Works description: Open Cut Excavation Required To Replace Defective Stop Tap That Is Causing A Potential Hazard, On Behalf Of United Utilities. In Footway, |
Responsibility for works: United Utilities Water |
Current status: Advanced planning |
|
|
Cambridge Road, Ellesmere Port, Cheshire West And Chester |
16 January — 20 January |
Delays possible |
Works location: Carriageway Junction Of Marchwiel Road To Junction Of Lees Lane On Cambridge Road, Cambridge Road |
Works description: Locate And Excavate 1 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Cyffylliog To Cefn Iwrch, Cyffylliog, Ruthin, Denbighshire |
15 January — 15 January |
Delays possible Traffic control (Stop/Go boards) |
Works location: Arfryn- Red Lion Terrace… |
Works description: Gwaith Ar Wasanaeth Uwchben/ Overhead Service Works… |
Responsibility for works: Denbighshire County Council |
Current status: Advanced planning |
|
|
Cyffylliog To Cefn Trevor Jct, Cyffylliog, Ruthin, Denbighshire |
15 January — 15 January |
Delays possible Traffic control (Stop/Go boards) |
Works location: Wrth Yr Hen Ysgol/ Nr Old School… |
Works description: Gwaith Ar Wasanaeth Uwchben/ Overhead Service Works… |
Responsibility for works: Denbighshire County Council |
Current status: Advanced planning |
|
|
Cyffylliog To Cefn Trevor Jct, Cyffylliog, Ruthin, Denbighshire |
15 January — 15 January |
Delays possible Traffic control (Stop/Go boards) |
Works location: Arfryn- Red Lion Terrace… |
Works description: Gwaith Ar Wasanaeth Uwchben/ Overhead Service Works… |
Responsibility for works: Denbighshire County Council |
Current status: Advanced planning |
|
|
Fulbrooke, Greenfield, Flintshire |
15 January — 17 January |
Delays possible Traffic control (Stop/Go boards) |
Works location: In Footway/Carriageway, Outside 27 To Outside 25 Fulbrooke, Maes Glas, Sir Y Fflint |
Works description: Remedial Work Required To Correct Defect |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
|
|
|
|
|
|