Llwyni Drive, Connahs Quay, Flintshire |
16 September — 18 September |
Delays possible Some carriageway incursion |
Works location: Rear Of 5 Mountain View Close |
Works description: Renew Stop Tap |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
Plymouth Street, Shotton, Flintshire |
16 September — 18 September |
Delays possible Traffic control (give & take) |
Works location: Outside 17 |
Works description: Works To Rectify Defective Reinstatemen |
Responsibility for works: SP Energy Networks |
Current status: Planned work about to start |
|
A541 Wrexham Road, Cefn-Y-Bedd, Flintshire |
16 September — 18 September |
Delays likely Traffic control (give & take) |
Works location: Works Outside Property ‘Wingerworth’ In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
A550 Hawarden Road, Hope, Flintshire |
16 September — 24 September |
Delays likely Traffic control (give & take) |
Works location: (Pcp8) 330959,357714 330968,357717 330972,357702 Opposite 95 Hawarden Road To Side Of 2 Heulwen Close On, Hawarden Road |
Works description: Install 19m Of 1 Way Poly Duct In Verge,Install 1m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Carriageway,Provide 1 Cabinet And Base (Nga Cabinets) |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B5127 Liverpool Road, Buckley, Flintshire |
15 September — 17 September |
Delays likely Traffic control (two-way signals) |
Works location: Outside 140 To Outside 71, Liverpool Road |
Works description: Install 1x 100m Of Cable Into Existing Duct,Provide 1 New Cable Line,Provide 1x 10 Joint/ Cable(S) Connections In Existing Plant |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B5127 Liverpool Road, Buckley, Flintshire |
15 September — 18 September |
Delays likely Traffic control (two-way signals) |
Works location: FootwayVergeCarriageway 67 Meters North Of Junction Of Hawkesbury Road, Liverpool Road |
Works description: Build 1 Concrete Chamber 2315mm X 737mm X 1565mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Verge,Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
Brick Road, Bretton, Flintshire |
16 September — 22 September |
Delays likely Road closure |
Works location: Junction Of Lesters Lane To Approx 240m South West From Outside Bretton Lodge Farm To Location On Brick Road, Brick Road |
Works description: To Route Prove, Install Sub Duct & Cable And Clear Any Blockages Found In C/W And Verge |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
South View Road, Chester, Cheshire West And Chester |
15 September — 17 September |
Delays likely Traffic control (two-way signals) |
Works location: Works Opposite Number 24 In Carriageway |
Works description: Renew Defective Casings And Lids (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Dale Street, Chester, Cheshire West And Chester |
15 September — 19 September |
Delays likely Road closure |
Works location: Chester: Full Extents: Cherry Grove Road To Filkins Lane:; Stephen Pinnington |
Works description: Kerbing And Footway Works – Site Investigation And Surfacing Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Neston Drive, Chester, Cheshire West And Chester |
15 September — 19 September |
Delays likely Road closure |
Works location: Newton: From Wealstone Lane To Thornton Dr Junc: Thornton Drive To Wealstone Lane:; Stephen Pinnington |
Works description: Carriageway Srufacing Newton |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
A5119 Northop Road, Flint, Flintshire |
15 September — 17 September |
Delays possible Some carriageway incursion |
Works location: O/S Roscote |
Works description: Locate And Renew Stop Tap |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
A540 Parkgate Road, Chester, Cheshire West And Chester |
16 September — 16 September |
Delays possible Some carriageway incursion |
Works location: Parkgate Road – Outside John Douglas Court |
Works description: Lane Closure For Tree Works |
Responsibility for works: Cheshire West And Chester Council |
Current status: Work in progress |
|
|
A55 |
15 September — 14 April 2015 |
Delays possible Lane closure |
Works location: A55, A55/A483 East & Westbound. Three Lanes Closed. |
Works description: 24h Lane Closures East & West Due To Pinch Point Scheme |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
A56 Hoole Road, Chester, Cheshire West And Chester |
16 September — 16 September |
Delays possible Some carriageway incursion |
Works location: Hoole Road Outside 42 |
Works description: Skip Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Work in progress |
|
|
B5125/A5104 Chester Road, Broughton, Flintshire |
15 September — 17 September |
Delays possible Traffic control (two-way signals) |
Works location: Chester Road, Chester |
Works description: Access Required Into Two Existing Boxes To Provide Fibre Cabling. No Excavation Required. |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
Lower Bridge Street, Chester, Cheshire West And Chester |
15 September — 17 September |
Delays possible Traffic control (give & take) |
Works location: Works Outside ‘Heritage Court’ In Flagged Footway |
Works description: Carry Out Trial Hole To Establish Depth Of Main And Other Utilities (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Brick Road, Lower Kinnerton, Chester, Cheshire West And Chester |
16 September — 22 September |
Delays possible Contra-flow |
Works location: Approx 240m South West From Outside Bretton Lodge Farm To Location To Junction Of Kinnerton Road On Brick Road |
Works description: To Route Prove, Install Sub Duct & Cable And Clear Any Blockages Found In C/W And Verge |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Dee Lane, Chester, Cheshire West And Chester |
15 September — 03 October |
Delays possible Traffic control (multi-way signals) |
Works location: Between Junction Of The Headlands & Adjacent To 5 |
Works description: Excavate 60 Metre Trench To Standard Depth, Open Cut In Carriageway & Footway For Underground Low Voltage Cable Fault To Prevent Loss Of Supply. Followed By Reinstatement. |
Responsibility for works: SP Energy Networks |
Current status: Advanced planning |
|
Mancot Lane, Mancot, Flintshire |
15 September — 25 September |
Delays possible Lane closure |
Works location: Junction Of Mancot Lane And Colliery Lane. |
Works description: Lane Closure To Mancot Lane To Coincide With Road Closure Of Colliery Lane (11810778). |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Mount Pleasant Road, Drury, Flintshire |
15 September — 24 September |
Delays possible Traffic control (two-way signals) |
Works location: Opposite Long Croft |
Works description: Excavate & Lay Approximately 150 Metres High Voltage Cable From Joint Bay In Footway Into Play Area Running Along Boundary Fence To High Voltage Terminal Pole On Easte Ground |
Responsibility for works: SP Energy Networks |
Current status: Planned work about to start |
|
|
Plymouth Street, Shotton, Flintshire |
16 September — 18 September |
Delays possible Traffic control (give & take) |
Works location: Outside 17 |
Works description: Works To Rectify Defective Reinstatemen |
Responsibility for works: SP Energy Networks |
Current status: Planned work about to start |
|
|
The Headlands, Chester, Cheshire West And Chester |
15 September — 03 October |
Delays possible Traffic control (multi-way signals) |
Works location: Rear Of 11 Grosvenor Park Road To Junction Of Dee Lane |
Works description: Excavate Large High Voltage Jointbay In Cyclepath & 62 Metre Trench To Standard Depth, Open Cut In Carriageway& Footway For Underground Low Voltage Cable Fault To Prevent Loss Of Supply. Followed By Reinstatement. |
Responsibility for works: SP Energy Networks |
Current status: Advanced planning |
|