Posted: Fri 6th Dec 2013

Roadworks In And Around Deeside starting from 6/12/13

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Friday, Dec 6th, 2013

Roadworks In And Around Deeside from 6/12/13

A5119 Northop Road, Flint, Flintshire
06 December — 09 December
Delays likely Traffic control (give & take)
Works location: In Footway Outside Number 86 Northop Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Planned work about to start

A41 Chester Road, Little Sutton, Ellesmere Port, Cheshire West And Chester
06 December — 10 December
Delays possible
Works location: Outside 373b
Works description: Missing Tee In Footway
Responsibility for works: Virgin Media
Current status: Advanced planning

A55
06 December — 07 December
Delays possible Lane closure
Works location: A55, A55 Welsh Border To A483 East & Westbound.
Works description: N – Overnight Total Closures East & Westbound Due To Scheme Works
Responsibility for works: Highways Agency
Current status: Planned work about to start
Knowsley Road, Eccleston, St Helens, St Helens Council
07 December — 11 December
Delays likely Traffic control (two-way signals)
Works location: Opposite 246 Knowsley Road In Carriageway…
Works description: Valve Remediation
Responsibility for works: National Grid Gas Plc
Current status: Advanced planning
A41 Whitchurch Road, Christleton, Chester, Cheshire West And Chester
06 December — 10 December
Delays likely Traffic control (give & take)
Works location: Works Outside Number 105 In Footway
Works description: Connect From Rear Of Meterfit To New Supply (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

A5032 Whitby Road, Ellesmere Port, Cheshire West And Chester
06 December — 10 December
Delays likely Traffic control (give & take)
Works location: Entwhistle Green Estate Agents 72a Whitby Road Ch65 0aa
Works description: Remedial Work Required To Correct Defect
Responsibility for works: BT
Current status: Advanced planning

A5119 Northop Road, Flint, Flintshire
06 December — 09 December
Delays likely Traffic control (give & take)
Works location: In Footway Outside Number 86 Northop Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Planned work about to start
Bryn Goleu Jct To School Jct, Pentre Halkyn, Flintshire
06 December — 09 December
Delays possible
Works location: In The Grass Verge Opposite School House
Works description: Overhead Line Works Only – No Excavation
Responsibility for works: Scottish Power
Current status: Planned work about to start

[dciframe]http://roadworks.org/,610,600,0,no,border:0px solid blue;align:left;[/dciframe]



Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com

LATEST NEWS...

First Minister: Kitchen and domestic staff working in care homes to recieve £500 extra payment

News

Doctors’ leaders say face coverings should be worn in Wales

News

Flintshire Council chiefs welcome schools reopening in June but Wales’ Chief Medical Officer wanted to hold off until August

News

Flint Coastguard called to assist with rescue of children and adult stuck in mud on Wirral coast

News

Tributes have been pouring in for Mold based playwright, poet and novelist Sion Eirian who has died after a short illness.

News

Wales’ Transport Minister call for new Deeside railway station to be built by 2024

News

Two dogs stolen from Denbighshire reunited with owner after being found in Flintshire

Denbighshire

Changes to Flintshire Household Recycling Centres from next week

News

Shielding set to continue for 130,000 people in Wales until August 16

News