ROADWORKS: Starting today in and around Flintshire 7th April

News and Info from Deeside, Flintshire, North Wales

[followbutton username=’deesidedotcom’]

Weather: 

Roadworks:

B5441 Station Road, Queensferry, Flintshire
07 April — 08 April
Delays likely Traffic control (two-way signals)
Works location: At The Railway Bridge (Rail Over Road Bridge No.22)
Works description: Building Stone Pillars At The Railway Bridge (Cnh3/22). Works Taking Place 07:00 – 16:00 Monday 7th April And Tuesday 8th April
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning
A55
07 April — 08 April
Delays possible Lane closure
Works location: A55, A55 Jct With A483 Eastbound Inc East & Westbound Exit Slip.
Works description: N – Nightime Lane One Closure East & Westbound For Scheme Works
Responsibility for works: Highways Agency
Current status: Planned work about to star
Rhos Estyn Lane, Hope, Flintshire
08 April — 09 April
Delays possible Traffic control (Stop/Go boards)
Works location: From Property 6 To 8
Works description: Overhead Line Works Only – No Excavation Date Of Outage: 08/04/2014
Responsibility for works: Scottish Power
Current status: Planned work about to start
A548 Prestatyn Road, Prestatyn, Denbighshire
07 April — 16 April
Delays likely Traffic control (two-way signals)
Works location: Prestayn
Works description: Remedial Patching
Responsibility for works: Denbighshire County Council
Current status: Advanced planning
A548 Prestatyn Road, Prestatyn, Denbighshire
07 April — 16 April
Delays likely Traffic control (two-way signals)
Works location: A548
Works description: Trwsio’S Lon Gerbydau/ Carriageway Repairs…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning
A548 Wellington Road, Rhyl, Denbighshire
07 April — 11 April
Delays likely Traffic control (two-way signals)
Works location: Bodfor Street Jct
Works description: Gwelliannau Diogelwch Ar Y Ffyrdd/ Road Safety Improvements…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning
A548 Wellington Road, Rhyl, Denbighshire
07 April — 16 April
Delays likely Traffic control (multi-way signals)
Works location: The Junction Of Wellington Road/Queeen Street/Bodfor Street…
Works description: The Existing Permanent Traffic Signals Which Incorporate Pedestrian Crossing Phases, Are To Be Repla…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning
A56 Chester Road, Helsby, Frodsham, Cheshire West And Chester
07 April — 09 April
Delays likely Traffic control (multi-way signals)
Works location: Footway And Carriageway Outside 196-198
Works description: Install 2 X New Short Sided Service Connections Off Existing Main
Responsibility for works: United Utilities Water
Current status: Advanced planning
A56 Hoole Road, Chester, Cheshire West And Chester
08 April — 09 April
Delays likely Road closure
Works location: At The Railway Bridge (Road Over Rail Bridge No.8)
Works description: Removal Of The Traffic Management And Site Compounds For The Bridge Refurbishment Works (Cnh2/8). Road Closure Required 21:00 Tuesday 8th April To 06:00 Wednesday 9th April.
Responsibility for works: Network Rail Infrastructure Ltd
Current status: Advanced planning

More...

Air ambulances respond as A541 closed near Flintshire border after serious crash

News

Football Museum of Wales brings history to life in Connah’s Quay

News

The eco-friendly motorhome: Sustainable travel tips for RVers

News

Student duo a force to be reckoned with after winning awards for new clothing range

News

£10m to boost jobs and wellbeing support in Wales

News

Ambitious expansion plans submitted for Christmas Farm near Flintsire border

News