Roadworks In And Around Deeside from 26/02/14

Chester Road : long term roadworks – Click Here for more


King George Street, Shotton, Flintshire
26 February — 28 February
Delays possible
Works location: Zzdig, In Footway Opposite 25, King George Street
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Planned work about to start


B5126 Connahs Quay Road, Northop, Flintshire
27 February — 28 February
Delays possible Traffic control (Stop/Go boards)
Works location: B5126 Flyover/J33a A55
Works description: Overhead Line Work
Responsibility for works: Scottish Power
Current status: Planned work about to start


 

Boundary Lane, Saltney, Flintshire
26 February — 28 February
Delays possible
Works location: Works Outside Number 116 In Footway
Works description: Carry Out Flow And Pressure Test At Boundary And Insert Meterfit At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start


 

A55
26 February — 27 February
Delays possible Lane closure
Works location: A55, A55 J36 – 35 Westbound.
Works description: Night Time Lanes 1 & 2 Westbound For Slot Cutting
Responsibility for works: Highways Agency
Current status: Planned work about to start


A5119 Northop Road, Northop, Flintshire
27 February — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: Outside Shadybrook Opposite The Cricket Ground
Works description: Overhead Line Work. Outage 27/02/14
Responsibility for works: Scottish Power
Current status: Planned work about to start

B5127 Liverpool Road, Buckley, Flintshire
26 February — 28 February
Delays likely Traffic control (two-way signals)
Works location: 105m North East Of Bowling Green, Liverpool Road, Buckley
Works description: Install New Ocnnection With Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start

Bumpers Lane, Chester, Cheshire West And Chester
27 February — 28 February
Delays likely Lane closure
Works location: Jnc Bumpers Lane/Sealand Road Chester Cheshire Ch1 4ps
Works description: Access Required Into A Carrageway Box Which Is Located On The Traffic Lights On Bumpers Lane To Allow Jointing Works To Be Carried Out To Provide Service. One Nights Working
Responsibility for works: BT
Current status: Advanced planning

Bumpers Lane, Chester, Cheshire West And Chester
27 February — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: In Footway Junction Of Hartford Way To Junction Of Sealand Road On Bumpers Lane, Chester, Ch1 4lt, B
Works description: Install 29m Of 1 Way Poly Duct In Carriageway,Install 81m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Ffordd Pen Y Bryn, Nercwys, Flintshire
26 February — 28 February
Delays likely Road closure
Works location: Opp 4 School Terrace, Ffordd Pen Y Bryn, Nercwys, Mold
Works description: Install New Connetion With Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start


 

Coed Onn Road, Flint, Flintshire
27 February — 07 March
Delays possible Traffic control (two-way signals)
Works location: Outside 96, Coed Onn Road
Works description: Install 24m Of 1 Way Poly Duct In Footway,Provide 1 Provide/Recover 1 Nga Cab And Base (1.5m X 0.5m)
Responsibility for works: BT
Current status: Planned work about to start

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com
Latest News

  • Flintshire: Rural Crime Team operation to tackle off-road bikes being used anti-socially and illegally
  • Labour’s Andy Dunbobbin re-elected as the Police and Crime Commissioner for North Wales
  • £4 million project to boost driver and pedestrian safety at Two Mills gets underway

  • More...

    Flintshire: Rural Crime Team operation to tackle off-road bikes being used anti-socially and illegally

    News

    Labour’s Andy Dunbobbin re-elected as the Police and Crime Commissioner for North Wales

    News

    £4 million project to boost driver and pedestrian safety at Two Mills gets underway

    News

    Over £1 Billion spent, yet Transport for Wales fails to meet standards, Senedd committee finds

    News

    Wales urged to protect at-risk citizens as prepayment meter ban ends

    News

    Synthite fire: Public urged to avoid River Alyn and keep animals away from the water after 50 dead fish found

    News

    Volunteers thanked for two decades of National Cycle Network maintenance around Deeside

    News

    Police hunt fraudster with links to Flintshire who conned Chester couple out of £350,000

    News

    Win a year at Le Cordon Bleu: 2024 scholarship competition now open

    News