ROADWORKS IN AND AROUND FLINTSHIRE STARTING: 20th May
[followbutton username=’deesidedotcom’]
Todays weather: Showery rain this morning, which is going to be heavy at times and occasionally thundery, tonight dry and fine with largely clear skies, particularly towards the west, becoming chilly with possible fog patches developing.
Fantastic picture taken during last nights spectacular lighting storm over Deeside.
A541 Mold Road, Caergwrle, Flintshire |
20 May — 22 May |
Delays likely Traffic control (give & take) |
Works location: Works Outside Number 15 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
A548 Sealand Road, Chester, Cheshire West And Chester |
20 May — 22 May |
Delays likely Traffic control (give & take) |
Works location: Works Outside Number 190 In Carriageway |
Works description: Renew Communication Pipe From Main To Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
B5101 B5101 Llanfynydd To Cymau Road, Llanfynydd, Flintshire |
21 May — 19 September |
Delays likely Road closure |
Works location: Whole Of Carriageway Footway And Verge |
Works description: Lay New Water Main Traffic Manaagenment In Accordacne With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access |
Responsibility for works: Dee Valley Water Plc |
Current status: Planned work about to start |
|
|
B5444 B5444 Pwll Glass Jct To A541 Jct, Mold, Flintshire |
21 May — 22 May |
Delays likely Road closure |
Works location: Outside Bryn Awel Hotel |
Works description: Excavate To Locate And Repair A Low Voltage Fault, 3 X Joint Bays Works, 3 Metre Trench Excavation. Reinstatement Should Be No Later Than 26/03/2014 |
Responsibility for works: Scottish Power |
Current status: Advanced planning |
|
|
Sovereign Way, Chester, Cheshire West And Chester |
21 May — 22 May |
Delays likely Traffic control (two-way signals) |
Works location: Sovereign Way Junction Of Jupiter Drive, Chester |
Works description: Repair Sunken Tar Following Sewer Collapse |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
A541 A541 Nant Jct To Village Rd Jct, Hendre, Flintshire |
20 May — 22 May |
Delays possible Traffic control (two-way signals) |
Works location: Starting 700 Metres North Of The Junction With Dolfechlas Road To 880 Metres North Of The Junction With Dolfechlas Road |
Works description: Rebuild Overhead Line & Replace 1 Decayed Pole |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
A548 New Crane Street, Chester, Cheshire West And Chester |
21 May — 23 May |
Delays possible Traffic control (give & take) |
Works location: Chester: Chester Col: B3: Almost Opposite Kitchen Street:; Laurence Scott |
Works description: Re-Concrete K/L Bollard Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
A55 |
20 May — 21 May |
Delays possible Road closure |
Works location: A55, A55 Jct 38 & A483 To Jct 7. |
Works description: N – Overnight Lane One Closed East & Westbound Due To Resurfacing |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
B5127 Liverpool Road, Buckley, Flintshire |
20 May — 22 May |
Delays possible Traffic control (give & take) |
Works location: 328571,365939 In Footway, Outside Four Winds , Liverpool Road |
Works description: Recover 1 Existing Pole |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
|
|
Brook Lane, Chester, Cheshire West And Chester |
20 May — 22 May |
Delays possible Traffic control (give & take) |
Works location: Works Adjacent To Number 2 Park Walk In Footway |
Works description: Carry Out Disconnection Of Supply (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Bryn Coch Lane, Mold, Flintshire |
21 May — 22 May |
Delays possible Traffic control (give & take) |
Works location: St Trillo, Bryn Coch Lane, Mold |
Works description: Repair Stop Tap |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Cornist Road, Flint, Flintshire |
20 May — 27 May |
Delays possible Traffic control (multi-way signals) |
Works location: Adjacent To 76 |
Works description: Excavation Of Jointbay And Track In Footway And Verge |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Halton Road, Upton, Chester, Cheshire West And Chester |
20 May — 22 May |
Delays possible Traffic control (give & take) |
Works location: In Footway, Junction Of Newhall Road, Halton Road |
Works description: Install 6m Of 1 Way Poly Duct In Footway |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Herons Way, Eccleston, Chester, Cheshire West And Chester |
21 May — 23 May |
Delays possible Traffic control (give & take) |
Works location: In Footway At Side Of Heronbridge House To Footway At Mast, Herons Way |
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 12m Of 1 Way Poly Duct In Footway |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Kinnerton Road Jct To Sandy Lane Jct, Hope, Flintshire |
21 May — 23 May |
Delays possible Traffic control (Stop/Go boards) |
Works location: Outside Shordley Oak |
Works description: Overhead Line Work. Outage 21/05/14 |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Sandy Lane, Higher Kinnerton, Flintshire |
21 May — 23 May |
Delays possible Traffic control (Stop/Go boards) |
Works location: Grange Farm |
Works description: Overhead Lines Work Date Of Outage 21/05/2014 |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Sandy Lane, Higher Kinnerton, Flintshire |
21 May — 23 May |
Delays possible Traffic control (Stop/Go boards) |
Works location: Near Castle Farm |
Works description: Overhead Line Work. Outage 21/05/14 |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Shordley Road, Hope, Flintshire |
21 May — 23 May |
Delays possible Traffic control (Stop/Go boards) |
Works location: Outside Shordley Manor |
Works description: Overhead Line Work. Outage 21/05/14 |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
St Anne Street, Chester, Cheshire West And Chester |
21 May — 23 May |
Delays possible Traffic control (give & take) |
Works location: Chester: Newton Col: S2: Near Of Salvation Army:; Laurence Scott |
Works description: Zebra Out Cheste |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
St Chads Road, Chester, Cheshire West And Chester |
21 May — 23 May |
Delays possible Traffic control (give & take) |
Works location: Blacon: Col: B 2: Junction Of Saughall Road:; Laurence Scott |
Works description: Replace Bollard With Weebol And 50mm Nal Socket Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
St Chads Road, Chester, Cheshire West And Chester |
21 May — 23 May |
Delays possible Traffic control (give & take) |
Works location: Blacon: Col: B 1: Junction Of Saughall Road:; Laurence Scott |
Works description: Replace Bollard With Weebol And Nal Socket Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|