Roadworks In And Around Deeside starting from 6/12/13
This article is old - Published: Friday, Dec 6th, 2013
Roadworks In And Around Deeside from 6/12/13
A5119 Northop Road, Flint, Flintshire
06 December — 09 December
Delays likely Traffic control (give & take)
Works location: In Footway Outside Number 86 Northop Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Planned work about to start
A55
06 December — 07 December
Delays possible Lane closure
Works location: A55, A55 Welsh Border To A483 East & Westbound.
Works description: N – Overnight Total Closures East & Westbound Due To Scheme Works
Responsibility for works: Highways Agency
Current status: Planned work about to start
Knowsley Road, Eccleston, St Helens, St Helens Council
07 December — 11 December
Delays likely Traffic control (two-way signals)
Works location: Opposite 246 Knowsley Road In Carriageway…
Works description: Valve Remediation
Responsibility for works: National Grid Gas Plc
Current status: Advanced planning
A41 Whitchurch Road, Christleton, Chester, Cheshire West And Chester
06 December — 10 December
Delays likely Traffic control (give & take)
Works location: Works Outside Number 105 In Footway
Works description: Connect From Rear Of Meterfit To New Supply (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning
A5032 Whitby Road, Ellesmere Port, Cheshire West And Chester
06 December — 10 December
Delays likely Traffic control (give & take)
Works location: Entwhistle Green Estate Agents 72a Whitby Road Ch65 0aa
Works description: Remedial Work Required To Correct Defect
Responsibility for works: BT
Current status: Advanced planning
A5119 Northop Road, Flint, Flintshire
06 December — 09 December
Delays likely Traffic control (give & take)
Works location: In Footway Outside Number 86 Northop Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Planned work about to start
Bryn Goleu Jct To School Jct, Pentre Halkyn, Flintshire
06 December — 09 December
Delays possible
Works location: In The Grass Verge Opposite School House
Works description: Overhead Line Works Only – No Excavation
Responsibility for works: Scottish Power
Current status: Planned work about to start
[dciframe]http://roadworks.org/,610,600,0,no,border:0px solid blue;align:left;[/dciframe]
Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: [email protected]
Latest News
Widespread flooding hits Flintshire as Storm Darragh batters the region
Flintshire County Council announces key service changes ahead of storm Darragh
Mold Christmas Market to go ahead on Sunday despite weather concerns
Get notified about news from across North Wales