Posted: Wed 22nd Jan 2014

Roadworks In And Around Deeside starting from 22/01/14

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Wednesday, Jan 22nd, 2014

[followbutton username=’deesidedotcom’]

Roadworks In And Around Deeside from 22/01/14

Chester Road West: 16 weeks of roadworks to start Monday 20th JanuaryClick Here for more

A494t Ruthin Road, Gwernymynydd, Flintshire
23 January — 27 January
Delays likely Traffic control (multi-way signals)
Works location: In Footway Outside Cemlyn, Ruthin Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 2 Poly Ducts In Footway
Responsibility for works: BT
Current status: Planned work about to start

A51/A5115 Christleton Road, Chester, Cheshire West And Chester
23 January — 27 January
Delays likely Traffic control (give & take)
Works location: Works Outside Number 28 In Footway
Works description: Install New Connection From Meterfit To Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

A541 High Street, Caergwrle, Flintshire
23 January — 24 January
Delays likely Traffic control (multi-way signals)
Works location: Opposite Ye Old Castle Inn Pub, High Street, Caergwrle
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

A541 Wrexham Road, Caergwrle, Flintshire
23 January — 24 January
Delays likely Traffic control (multi-way signals)
Works location: Otuside Ye Old Castle Inn Pub, Wrexham Road, Caergwrle
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

A56 Hoole Road, Chester, Cheshire West And Chester
22 January — 24 January
Delays likely Traffic control (give & take)
Works location: Works Outside Number 111 In Grass Verge
Works description: Final Site Check Of Verge Temp To Final Following – Install Meterfit At Boundary (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

Brook Lane, Chester, Cheshire West And Chester
23 January — 27 January
Delays possible Traffic control (give & take)
Works location: Works Adjacent To Number 2 Park Walk In Footway
Works description: Carry Out Disconnection Of Supply (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

Station Road, Backford By Lea, Chester, Cheshire West And Chester
23 January — 27 January
Delays possible Traffic control (give & take)
Works location: Works Outside Number 1 In Footway
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

Chambers Lane, Mynydd Isa, Flintshire
22 January — 24 January
Delays possible Traffic control (give & take)
Works location: Opposite 1 Chambers Lane, Mynydd Isa
Works description: Sewer Repair
Responsibility for works: Welsh Water
Current status: Planned work about to start

Kinnerton Road, Higher Kinnerton, Flintshire
22 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: Starting 20 Metres Northeast Of Mount Cottage To 35 Metres South
Works description: Reconnect 2 X Underground Services In Private
Responsibility for works: Scottish Power
Current status: Planned work about to start

Nant Mawr Road, Buckley, Flintshire
22 January — 23 January
Delays possible Traffic control (give & take)
Works location: Conamore, Nant Mawr Road, Buckley
Works description: House Hold Meter Option – Fit
Responsibility for works: Welsh Water
Current status: Planned work about to start

North Street, Sandycroft, Flintshire
23 January — 24 January
Delays possible Traffic control (multi-way signals)
Works location: Side Of Post Office Phoenix Street On North Street Junction Of Phoenix Street, Sandycroft
Works description: Repair Leaking Main
Responsibility for works: Welsh Water
Current status: Planned work about to start

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: [email protected] Latest News

  • Student duo a force to be reckoned with after winning awards for new clothing range
  • £10m to boost jobs and wellbeing support in Wales
  • Ambitious expansion plans submitted for Christmas Farm near Flintsire border

  • More...

    Student duo a force to be reckoned with after winning awards for new clothing range

    News

    £10m to boost jobs and wellbeing support in Wales

    News

    Ambitious expansion plans submitted for Christmas Farm near Flintsire border

    News

    Pothole-related breakdowns double, says RAC

    News

    Thousands more driving tests each month to cut wait times

    News

    Flint man jailed after attack on teen and police officer

    News

    Plans to convert Shotton’s old police station into home

    News

    Drugs stash hidden in Irn-Bru can at Creamfields

    News

    Mold: Live on the Square returns with packed music lineup

    News