A494t Ruthin Road, Gwernymynydd, Flintshire |
23 January — 27 January |
Delays likely Traffic control (multi-way signals) |
Works location: In Footway Outside Cemlyn, Ruthin Road |
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 2 Poly Ducts In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A51/A5115 Christleton Road, Chester, Cheshire West And Chester |
23 January — 27 January |
Delays likely Traffic control (give & take) |
Works location: Works Outside Number 28 In Footway |
Works description: Install New Connection From Meterfit To Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
A541 High Street, Caergwrle, Flintshire |
23 January — 24 January |
Delays likely Traffic control (multi-way signals) |
Works location: Opposite Ye Old Castle Inn Pub, High Street, Caergwrle |
Works description: Renew Frame And Cover |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
A541 Wrexham Road, Caergwrle, Flintshire |
23 January — 24 January |
Delays likely Traffic control (multi-way signals) |
Works location: Otuside Ye Old Castle Inn Pub, Wrexham Road, Caergwrle |
Works description: Renew Frame And Cover |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
A56 Hoole Road, Chester, Cheshire West And Chester |
22 January — 24 January |
Delays likely Traffic control (give & take) |
Works location: Works Outside Number 111 In Grass Verge |
Works description: Final Site Check Of Verge Temp To Final Following – Install Meterfit At Boundary (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Brook Lane, Chester, Cheshire West And Chester |
23 January — 27 January |
Delays possible Traffic control (give & take) |
Works location: Works Adjacent To Number 2 Park Walk In Footway |
Works description: Carry Out Disconnection Of Supply (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Station Road, Backford By Lea, Chester, Cheshire West And Chester |
23 January — 27 January |
Delays possible Traffic control (give & take) |
Works location: Works Outside Number 1 In Footway |
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Chambers Lane, Mynydd Isa, Flintshire |
22 January — 24 January |
Delays possible Traffic control (give & take) |
Works location: Opposite 1 Chambers Lane, Mynydd Isa |
Works description: Sewer Repair |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Kinnerton Road, Higher Kinnerton, Flintshire |
22 January — 23 January |
Delays possible Traffic control (two-way signals) |
Works location: Starting 20 Metres Northeast Of Mount Cottage To 35 Metres South |
Works description: Reconnect 2 X Underground Services In Private |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Nant Mawr Road, Buckley, Flintshire |
22 January — 23 January |
Delays possible Traffic control (give & take) |
Works location: Conamore, Nant Mawr Road, Buckley |
Works description: House Hold Meter Option – Fit |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
North Street, Sandycroft, Flintshire |
23 January — 24 January |
Delays possible Traffic control (multi-way signals) |
Works location: Side Of Post Office Phoenix Street On North Street Junction Of Phoenix Street, Sandycroft |
Works description: Repair Leaking Main |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|