Posted: Thu 19th Dec 2013

Roadworks In And Around Deeside starting from 19/12/13

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Thursday, Dec 19th, 2013

Roadworks In And Around Deeside from 19/12/13 ‌​‌‌​​​‌‍‌​‌​‌‌‌​‍‌​‌​‌‌​​‍‌​​‌‌‌‌​‍‌​​​​‌‌​‍‌​‌​‌​‌‌‍‌​​‌​‌‌‌‍‌​​‌‌​‌​‍‌​​​​‌‌​‍‌​‌‌‌‌‌​‍‌​​​‌‌​‌‍‌​​‌‌​‌​‍‌​‌​‌​‌‌‍‌​​‌​‌‌‌‍‌​​‌​‌‌​‍‌​​‌‌​‌​‍‌​​​‌​​‌‍‌​​‌‌​‌​‍‌​​​‌‌​​

A5119 Northop Road, Flint, Flintshire
20 December — 24 December
Delays likely Traffic control (give & take)
Works location: Swn Y Gwynt, O/S Entrance To The Cottage, Northop Road
Works description: Locate Stop Tap With Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start

A549 Chester Road, Buckley, Flintshire
19 December — 20 December
Delays possible Traffic control (give & take)
Works location: Brackendale, Chester Road, Buckley
Works description: House Hold Meter Option – Fit
Responsibility for works: Welsh Water
Current status: Planned work about to start

Towers Way, Penyffordd, Flintshire
19 December — 23 December
Delays possible Traffic control (multi-way signals)
Works location: Works Near The Junction With Corwen Road In Carriageway
Works description: Rebuild Defective Chamber (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start
B5121 B5121 Greystones Jct To A541, Lixwm, Flintshire
19 December — 20 December
Delays possible Traffic control (two-way signals)
Works location: Outside Bryn-Teg
Works description: Overhead Line Works Only – No Excavation
Responsibility for works: Scottish Power
Current status: Planned work about to start

A549 Chester Road, Buckley, Flintshire
19 December — 20 December
Delays possible Traffic control (give & take)
Works location: Brackendale, Chester Road, Buckley
Works description: House Hold Meter Option – Fit
Responsibility for works: Welsh Water
Current status: Planned work about to start
A550 Hawarden Road, Hope, Flintshire
19 December — 20 December
Delays likely Traffic control (two-way signals)
Works location: Bridge End Cottage, Hawarden Road, Hope
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

A550 Hawarden Road, Hope, Flintshire
20 December — 24 December
Delays likely Traffic control (two-way signals)
Works location: In Footway Outside Numbers 43/45 On Ffordd Penarlag, Hawarden Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Planned work about to start

[dciframe]http://roadworks.org/,610,600,0,no,border:0px solid blue;align:left;[/dciframe] ‌​‌‌​​​‌‍‌​‌​‌‌‌​‍‌​‌​‌‌​​‍‌​​‌‌‌‌​‍‌​​​​‌‌​‍‌​‌​‌​‌‌‍‌​​‌​‌‌‌‍‌​​‌‌​‌​‍‌​​​​‌‌​‍‌​‌‌‌‌‌​‍‌​​​‌‌​‌‍‌​​‌‌​‌​‍‌​‌​‌​‌‌‍‌​​‌​‌‌‌‍‌​​‌​‌‌​‍‌​​‌‌​‌​‍‌​​​‌​​‌‍‌​​‌‌​‌​‍‌​​​‌‌​​

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com

Latest News

  • Number of households missing essential payments hits highest level recorded, Which? warns
  • Jack Sargeant Column: UK Government failing to get a grip of big business profiteering
  • Miss Wales calls on communities across Wales to give someone ‘the best gift’ this Christmas after receiving lifesaving blood transfusions

  • More...

    Number of households missing essential payments hits highest level recorded, Which? warns

    News

    Jack Sargeant Column: UK Government failing to get a grip of big business profiteering

    News

    Miss Wales calls on communities across Wales to give someone ‘the best gift’ this Christmas after receiving lifesaving blood transfusions

    News

    Petrol prices drop, but UK drivers still overcharged, says RAC

    News

    Flintshire Council reviews progress in school learning programme

    News

    Deeside MP discovers how cat charity helps domestic abuse victims

    News

    Lack of support in schools having major impact on disabled children in Wales, Senedd told

    News

    4×4 Response Wales helping to support emergency services and local communities

    News

    UK’s largest care home developer submits plans for new 66 bedroom site in Deeside

    Flintshire