| A494 Park Road, Ruthin, Denbighshire |
| 06 September — 06 September |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Footpath Opposite Min Yr Afon… |
| Works description: Cut Back Hedge Encroaching Onto Footway… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| A525 Vale Road, Rhyl, Denbighshire |
| 05 September — 10 September |
| Delays likely Traffic control (give & take) |
| Works location: Connecting Onto Main O/S No.89 Laying Service To No.93… |
| Works description: Lay New Service – 20m Public 2m Private… |
| Responsibility for works: Wales & West Utilities Ltd |
| Current status: Advanced planning |
|
|
| A542 Abbey Road, Llangollen, Denbighshire |
| 06 September — 09 September |
| Delays likely Traffic control (two-way signals) |
| Works location: 1 |
| Works description: Adnewyddu Polyn / Renew Pole… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| A542 Abbey Road, Llangollen, Denbighshire |
| 06 September — 09 September |
| Delays likely Traffic control (two-way signals) |
| Works location: St Johns Church |
| Works description: Adnewyddu Polyn / Renew Pole… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| A542 Abbey Road, Llangollen, Denbighshire |
| 06 September — 10 September |
| Delays likely Traffic control (two-way signals) |
| Works location: Abbey Road |
| Works description: Replace 1 Existing Pole 0.5m X 0.5m… |
| Responsibility for works: BT |
| Current status: Advanced planning |
|
|
| A542 Abbey Road, Llangollen, Denbighshire |
| 06 September — 10 September |
| Delays likely Traffic control (two-way signals) |
| Works location: Outside Hafoty And Bryngwyn Abbey Road Llangollen… |
| Works description: Replace 1 Existing Pole 0.5m X 0.5m… |
| Responsibility for works: BT |
| Current status: Advanced planning |
|
|
| A543 Rhyl Road, Denbigh, Denbighshire |
| 06 September — 10 September |
| Delays likely Traffic control (two-way signals) |
| Works location: Os Gloddaeth Villas |
| Works description: Gwaith Trydan / Electrical Works… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| A543 Rhyl Road, Denbigh, Denbighshire |
| 06 September — 10 September |
| Delays likely Traffic control (multi-way signals) |
| Works location: Outside Glascoed To Gloddaeth Villas… |
| Works description: Replace 2 X Poles In Grass Verge& 1 X Pole In Footway… |
| Responsibility for works: Scottish Power |
| Current status: Advanced planning |
|
|
| A56 Walton New Road, Warrington, Warrington |
| 05 September — 11 September |
| Delays likely Traffic control (two-way signals) |
| Works location: Outside 89a, Near To The Junction Of Chelford Close |
| Works description: Excavate To Standard Depth, Open Cut, One Jointbay And 4m Track In Footway , And 6m Road Crossing In Carriageway For Underground Electrical Service Connection. Followed By A Permanent Reinstatement. |
| Responsibility for works: Scottish Power |
| Current status: Planned work about to start |
|
|
| A56 Walton New Road, Warrington, Warrington |
| 06 September — 17 September |
| Delays likely Traffic control (two-way signals) |
| Works location: Outside Property 89a |
| Works description: Excavate Joint Bay In Footway, Excavte Road Crossing, Excavate Track In Footway & Lay Cable |
| Responsibility for works: Scottish Power |
| Current status: Planned work about to start |
|
|
| A570 Rainford Bypass, Rainford, St Helens, St Helens Council |
| 06 September — 07 September |
| Delays likely Lane closure |
| Works location: Opposite 182 St Helens Road… |
| Works description: Excavation For A Trial Hole To Investigate Levels Of Drain… |
| Responsibility for works: St Helens Metropolitan Borough Council |
| Current status: Advanced planning |
|
|
| Berrys Lane, St Helens, St Helens Council |
| 06 September — 10 September |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Junction Of Berrys Lane And Waterland Lane And Opposite… |
| Works description: Repair Leaking Main On Footway And Carriageway To Prevent An Unplanned Interruption To Supply Or Ser… |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| Bryntirion Avenue, Prestatyn, Denbighshire |
| 06 September — 06 September |
| Delays likely Road closure |
| Works location: Bryntirion Avenue |
| Works description: Ailwynebu/ Resurfacing… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Bryntirion Avenue, Prestatyn, Denbighshire |
| 06 September — 10 September |
| Delays likely Road closure |
| Works location: Whole Road |
| Works description: Micro Asphalt |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Dawson Avenue, St Helens, St Helens Council |
| 05 September — 12 September |
| Delays likely Road closure |
| Works location: Full Length |
| Works description: Carriageway Resurfacing… |
| Responsibility for works: St Helens Metropolitan Borough Council |
| Current status: Advanced planning |
|
|
| High Street, Saltney, Flintshire |
| 05 September — 09 September |
| Delays likely Traffic control (give & take) |
| Works location: Outside Number 92 In Carriageway |
| Works description: Defective Reinstatement Following A Temp To Final Reinstatement After Repack Valve (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians) |
| Responsibility for works: Dee Valley Water Plc |
| Current status: Planned work about to start |
|
|
| M56 |
| 05 September — 09 September |
| Delays likely |
| Works location: On The M56 Westbound Between Junctions J10 And J11, Expect Delays Of Up To 10 Mins At Peak Times Due To Barrier Repairs Closing Two Lanes, Between 9 Pm And 5 Am, From 5 September 2013 To 9 September 2013. |
| Works description: – |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| Old Lane, Rainford, St Helens, St Helens Council |
| 06 September — 10 September |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Outside And Opposite 19… |
| Works description: Gang To Carry Out Defect Repair At Depth Of Under 1.5 Metres By Minimum Dig With Permanent Reinstate… |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| A494 |
| 05 September — 06 September |
| Delays possible Lane closure |
| Works location: A494, A494 East And Westbound. |
| Works description: Nightime Lane Two Closure Both Directions For Barrier Repairs |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| A49 London Road, Warrington, Warrington |
| 05 September — 09 September |
| Delays possible |
| Works location: 14 London Road , Stockton Heath , Warrington |
| Works description: Remedial Works Following Defect Inspection – Re-Lay Block Paving And Silver Sand Joints In F/W |
| Responsibility for works: National Grid Gas Plc |
| Current status: Planned work about to start |
|
|
| A49 London Road, Warrington, Warrington |
| 06 September — 10 September |
| Delays possible |
| Works location: Footway Outside 34 To Outside 28 & Outside 28 To Outside 14 London Road |
| Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct |
| Responsibility for works: BT |
| Current status: Planned work about to start |
|
|
| A49 London Road, Warrington, Warrington |
| 06 September — 10 September |
| Delays possible |
| Works location: Outside Number 252 |
| Works description: Install External Water Meter In Boundary Box |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| A49 Winwick Road, Warrington, Warrington |
| 06 September — 10 September |
| Delays possible |
| Works location: In Footway/Carriageway 240 Meters & 360 Meters & 510 Meters & 590 Meters & 630 Meters & 220 Meters & 215 Meters & 200 Me |
| Works description: Excavate 8 To Locate Or Expose Buried Plant,Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Footway |
| Responsibility for works: BT |
| Current status: Planned work about to start |
|
|
| A5036 |
| 05 September — 06 September |
| Delays possible Lane closure |
| Works location: A5036, Switch Islands. One Lane Closed. |
| Works description: Nightime Lane One Ipv Closure On Roundabout For Lighting Repairs |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| A550 Hawarden Road, Caergwrle, Flintshire |
| 06 September — 10 September |
| Delays possible |
| Works location: Works Rear Of Property ‘Corner Way’ In Footway |
| Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians) |
| Responsibility for works: Dee Valley Water Plc |
| Current status: Planned work about to start |
|
|
| A55 |
| 05 September — 06 September |
| Delays possible Road closure |
| Works location: A55, A55 / A51 Eastbound. |
| Works description: N – Overnight Lane Two Closed Becoming A Total Closure At The Exit Slip – Total Closure Of Access Slip Eastbound Due To Resurfacing |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| A55 |
| 06 September — 07 September |
| Delays possible Lane closure |
| Works location: A55, A41/A55 East & Westbound. One Lane Closed. |
| Works description: N -Overnight Lane One Closed On Roundabout And Lane Two Closed East & Westbound Due To Lamp Replacement |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| A574 Cromwell Avenue, Warrington, Warrington |
| 05 September — 09 September |
| Delays possible |
| Works location: Junction With Westbrok Way (Asda Supply) |
| Works description: Reset Valve Frame And Cover |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| A574 Cromwell Avenue, Warrington, Warrington |
| 05 September — 09 September |
| Delays possible |
| Works location: Junctin Twenty Acre Road |
| Works description: Trial Hoeld To Uncover Valve |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| A574 Cromwell Avenue, Warrington, Warrington |
| 06 September — 10 September |
| Delays possible |
| Works location: Junction Shackleton Close |
| Works description: Trail Hole On 300mm Water Main To Locate Branch Valve |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| A574 Cromwell Avenue, Warrington, Warrington |
| 06 September — 10 September |
| Delays possible |
| Works location: Junction Twenty Acre Drive |
| Works description: Install Fire Hydrant On 200mm Main |
| Responsibility for works: United Utilities Water |
| Current status: Planned work about to start |
|
|
| B5203 Catchdale Moss Lane, Eccleston, St Helens, St Helens Council |
| 06 September — 10 September |
| Delays possible |
| Works location: Junction Of East Lancs Road / Catchdale Moss Lane… |
| Works description: Breakout And Replace The Damaged Illuminated Signpost. Permanent Reinstatement… |
| Responsibility for works: St Helens Metropolitan Borough Council |
| Current status: Advanced planning |
|
|
|
|
|
| Bryntirion Avenue, Prestatyn, Denbighshire |
| 06 September — 10 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Bryntirion Avenue |
| Works description: Ailwynebu/ Resurfacing… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Saighton Lane, Saighton, Chester, Cheshire West And Chester |
| 06 September — 06 September |
| Delays possible Traffic control (two-way signals) |
| Works location: At The Bridge |
| Works description: Half Road Closure With 2 Way Lights Required To Repair And Replace Approach Fencing. Road To Be Closed From 06/09/2013 – 0730 Until 06/09/2013 – 1730 |
| Responsibility for works: Network Rail Infrastructure Ltd |
| Current status: Advanced planning |
|
|
| Car Park Fron Road, Connahs Quay, Flintshire |
| 06 September — 09 September |
| Delays possible Traffic control (two-way signals) |
| Works location: At Side Of 35 Ffordd Dyfrdwy, On Breeze Hill, Deeside, Ch5 4nu |
| Works description: Provide Pole |
| Responsibility for works: BT |
| Current status: Planned work about to start |
|
|
| Chatsworth Close, Prestatyn, Denbighshire |
| 06 September — 10 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Cahtsworth Close |
| Works description: Micro Asphalt |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Earle Street, Newton Le Willows, St Helens, St Helens Council |
| 06 September — 10 September |
| Delays possible |
| Works location: In F/W Outside 400 |
| Works description: Install External Water Meter In Boundary Box At Depth Of Under 1.5 Meters With Open Excavation With… |
| Responsibility for works: United Utilities Water |
| Current status: Advanced planning |
|
|
| Ellis Avenue, Rhyl, Denbighshire |
| 05 September — 09 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Whole Road |
| Works description: Micro Asphalt |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Elm Grove, Rhyl, Denbighshire |
| 05 September — 09 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Whole Road |
| Works description: Micro Asphalt |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Elm Grove, Rhyl, Denbighshire |
| 05 September — 09 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Elm Grove |
| Works description: Ailwynebu/ Resurfacing… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Garnett Avenue, Rhyl, Denbighshire |
| 05 September — 09 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Garnett Avenue |
| Works description: Ailwynebu/ Resurfacing… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| Garnett Avenue, Rhyl, Denbighshire |
| 05 September — 09 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Whole Road |
| Works description: Micro Asphalt |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
|
|
|
| Legh Street, Newton Le Willows, St Helens, St Helens Council |
| 06 September — 10 September |
| Delays possible |
| Works location: In F/W Outside 187 |
| Works description: Install External Water Meter In Boundary Box At Depth Of Under 1.5 Meters With Open Excavation With… |
| Responsibility for works: United Utilities Water |
| Current status: Advanced planning |
|
|
| Linden Drive, Prestatyn, Denbighshire |
| 06 September — 10 September |
| Delays possible Traffic control (Stop/Go boards) |
| Works location: Linden Drive |
| Works description: Ailwynebu/ Resurfacing… |
| Responsibility for works: Denbighshire County Council |
| Current status: Advanced planning |
|
|
| M53 |
| 05 September — 06 September |
| Delays possible Lane closure |
| Works location: M53, M53 Jct 2 – 1 North & Southbound. One Lane Closed. |
| Works description: N – Overnight Hard Shoulder And Lane One Closed North & Southbound Due To Bridge Survey |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| M53 |
| 05 September — 06 September |
| Delays possible Lane closure |
| Works location: M53, M53 Jct 4 – 3 North & Southbound. Two Lanes Closed. |
| Works description: N – Overnight Lanes Two & Three Closed North & Southbound Due To Survey Works |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| M56 |
| 05 September — 06 September |
| Delays possible Lane closure |
| Works location: M56, M56 W/B Jct 10-11. |
| Works description: N – Overnight L2&3 W/B Closure – Barrier Works. |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|
|
| M56 |
| 05 September — 06 September |
| Delays possible Lane closure |
| Works location: M56, M56 Jct 12 Eastbound Inc Exit & Access Slips. |
| Works description: N – Overnight Single Lane Running Mainline & Total Closure On Exit & Access Eastbound Due To Resurfacing |
| Responsibility for works: Highways Agency |
| Current status: Planned work about to start |
|