Posted: Wed 4th May 2016

Full closure of Queensferry roundabout from 6.30pm tonight.

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Wednesday, May 4th, 2016

[vc_row][vc_column][vc_column_text]

Queensferry roundabout will be shut tonight for just over twelve hours from 6.30pm to 7am as workers ‘race’ to complete the ongoing roadworks program.

The roundabout remodelling scheme is currently three weeks behind schedule due to ‘unforeseen circumstances’ and work is not expected to be fully complete for another couple of weeks

Local businesses have reported being hit hard hit by the roadworks which are being carried on the Asda junction, the A494 slip roads and the lanes around the roundabout.

Andre Potter owner of Absolute Comfort Furniture which sits right next to the roadworks said sales had dropped in his shop since the start of the work in early February by a massive 70%.

Tonight’s closure comes ahead of the weekends full closure and will bring disruption for all drivers wanting to use the roundabout this evening, a number of diversions will be in place and bus services will also be affected tonight.

Map of diversion routes (link to large version of map)

Screen Shot 2016-05-04 at 11.27.43[/vc_column_text][vc_row_inner content_placement=”top”][vc_column_inner width=”1/3″ css=”.vc_custom_1462357893786{background-color: #eeee22 !important;}”][vc_column_text css=”.vc_custom_1462357970869{padding-top: 0px !important;padding-right: 0px !important;padding-bottom: 0px !important;padding-left: 0px !important;}”]

EASTBOUND DIVERSION

[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″ css=”.vc_custom_1462358067083{background-color: #f939d6 !important;}”][vc_column_text css=”.vc_custom_1462358052268{padding-top: 0px !important;padding-right: 0px !important;padding-bottom: 0px !important;padding-left: 0px !important;}”]

WESTBOUND DIVERSION

[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″ css=”.vc_custom_1462358127302{background-color: #42d662 !important;}”][vc_column_text css=”.vc_custom_1462358223063{padding-top: 0px !important;padding-right: 0px !important;padding-bottom: 0px !important;padding-left: 0px !important;}”]

DIVERSION A548 to A55

[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_column_text]

The roundabout will be back open at 7am on Thursday morning, on Thursday evening  the Eastbound ‘off slip’ will be closed from 7pm to 6am, a diversion via Deeside Industrial Park will be in place.
On Friday there will be another full roundabout closure, this time from 6.30pm through to 7am on Monday morning while resurfacing work takes place, diversionary routes will again be in place.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

Changes to bus services as listed below.

[/vc_column_text][vc_column_text]13164300_10153590747606344_5512963657342093920_n

Picture Darren Cooper/Facebook[/vc_column_text][vc_row_inner][vc_column_inner][vc_column_text]

Steve Jones, Streetscene and Transportation said,

“The scheme is just under three weeks behind the original programme, due to unforeseen circumstances and some additional resurfacing works which were required on the roundabout slip roads. The engineering works will be completed by Sunday 15 May however the temporary traffic controls will be required during the following week to allow the commissioning of the new traffic signals to take place.”

The works which began in early February consists of:

  • Widening of slip roads from the A494 to the Queensferry roundabout.
  • Widening of the Queensferry roundabout to create extra running lanes.
  • Remodelling of the junction of the B5129 and the B5441 at ASDA.
  • Signalisation of all the approaches to the Queensferry roundabout.
  • Upgrading and linking all existing and new traffic signals.

[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row]

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com
Latest News

  • First minister urged to hand back £200,000 donation from convicted environmental polluter
  • North Wales Police and Crime Commissioner (PCC) election takes place today
  • Senedd: Call for action on steel jobs

  • More...

    First minister urged to hand back £200,000 donation from convicted environmental polluter

    News

    North Wales Police and Crime Commissioner (PCC) election takes place today

    News

    Senedd: Call for action on steel jobs

    News

    North Wales mushroom expert to compete on Aldi’s Channel 4 TV show

    News

    Plans for Senedd increase and voting system change move forward

    News

    Want an Aldi in Deeside? The supermarket is calling on the public to pinpoint prime locations

    News

    Plans submitted for ten new industrial units in Shotton.

    News

    Difficulties accessing GP practices in Wales leaving many older people suffering in pain

    News

    Rare Male Giant Otter arrives at Chester Zoo to help save species from extinction

    News