Traffic interruptions
|
|
|
|
|
Roadworks |
A540 Parkgate Road, Chester, Cheshire West and Chester |
19 November — 21 November |
Delays likely Lane closure |
Works location: FROM OUTSIDE HERTZ RENTALS TO JUST PAST CHESHIRE TRADE CENTRE… |
Works description: LOWER DUCT IN FW |
Responsibility for works: Vodafone |
Current status: Advanced planning |
Works reference: NX50218JHG189 |
|
|
|
|
A55 A55t Rhuallt Hill to Waen Junction, Rhuallt, St Asaph, Denbighshire |
19 November — 21 November |
Delays likely Lane closure |
Works location: A55, Rhuallt Hill Bridge – Eastbound Carriageway |
Works description: Parapet Repairs – Overnight Works between 20:00hrs and 06:00hrs |
Responsibility for works: Welsh Government |
Current status: Planned work about to start |
Works reference: PD5011831712553966 |
|
|
Abbotts Lane, Penyffordd, Flintshire |
19 November — 21 November |
Delays likely Road closure |
Works location: LAYING SERVICE TO NEW BUILD ADJ TO TALOSSAMMEROAD CLOSURE BETWEEN – O/S WAVERLEY TOO/S WESTBOURNE |
Works description: LAY NEW SERVICE – 3M PUBLIC 117M PRIVATE |
Responsibility for works: Wales & West Utilities Limited |
Current status: Planned work about to start |
Works reference: XY253004000144165 |
|
|
B5125 B5125 Village Road From Wepre Lane Junction to Smithy Lane Junction, Northop Hall, Flintshire |
21 November — 23 November |
Delays likely Traffic control (two-way signals) |
Works location: o/s hawthorne cottage on B5125 VILLAGE ROAD FROM WEPRE LANE JUNCTION TO SMITHY LANE JUNCTION |
Works description: CONNAHS QUAY – 544791 – THIS JOB IS TO PROVIDE STAND-OFF CABINET TO EXISTING PCP SHELL AND ADDITIONAL 2MDUCT in fw |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006MU1WBAUNWIBUM4KME02 |
|
|
B5125 B5125 Village Road From Wepre Lane Junction to Smithy Lane Junction, Northop Hall, Flintshire |
21 November — 04 December |
Delays likely Traffic control (give & take) |
Works location: From outside Plas Newydd to approx 19m SE on B5125 VILLAGE ROAD FROM WEPRE LANE JUNCTION TO SMITHY LANE JUNCTION |
Works description: CONNAHS QUAY 24 – DSLAM 524463, 524462 – STREET CABINET and POWER INSTALLATION. Excavate to lay approx 17m BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay approx 2m duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006MU1WBAUNWWAJVUH0N01 |
|
|
|
|
B5133 Hanns Hall Road, Neston, Cheshire West and Chester |
19 November — 21 November |
Delays likely Traffic control (multi-way signals) |
Works location: AT JUNCTION WITH QUARRY ROAD ON HANNS HALL ROAD… |
Works description: NESTON 26 – DSLAM 476478 – TRAFFIC MANAGEMENT to facilitate BT Openreach Fibre Cabling Works. Portab… |
Responsibility for works: Openreach |
Current status: Advanced planning |
Works reference: BC006MU1WSEP00IBTGGLPT03 |
|
|
B5133 Hooton Road, Hooton, Ellesmere Port, Cheshire West and Chester |
20 November — 22 November |
Delays likely Traffic control (two-way signals) |
Works location: Approx 73m from benty heath lane… |
Works description: Abandon 3″ CL main |
Responsibility for works: United Utilities |
Current status: Advanced planning |
Works reference: HZ09054000024056-0020/2 |
|
|
Padeswood Road North, Buckley, Flintshire |
21 November — 23 November |
Delays likely Road closure |
Works location: OUTIDE HEALTH CENTRE |
Works description: INSTALL NEW SERVICE CONNECTION |
Responsibility for works: WELSH WATER |
Current status: Planned work about to start |
Works reference: PE12594769773 |
|
|
Quarry Road, Neston, Cheshire West and Chester |
19 November — 21 November |
Delays likely Traffic control (multi-way signals) |
Works location: OPPOSITE JUNCTION HANNS HALL ROAD ON QUARRY ROAD… |
Works description: NESTON 26 – DSLAM 476478 – To build new joint box in verge/cw… |
Responsibility for works: Openreach |
Current status: Advanced planning |
Works reference: BC006MU1WSEP00IBTGGLPT04 |
|
|
|
|
The Village, Burton, Neston, Cheshire West and Chester |
19 November — 21 November |
Delays likely Traffic control (Stop/Go boards) |
Works location: O/S MANOR FARM ON THE VILLAGE, THE VILLAGE… |
Works description: REPLACE 1 X EXISTING POLE… |
Responsibility for works: Openreach |
Current status: Advanced planning |
Works reference: BC006TI002AP500267778502 |
|
|
Travellers to Salisbury Arms Road, Caerwys, Mold, Denbighshire |
19 November — 19 November |
Delays likely Road closure |
Works location: APPROXIMATELY 150 m SOUTH-WEST OF DRIVE TO PROPERTY “CAE RHYS” |
Works description: REMEDIAL REINSTATEMENT FOLLOWING MAINS BURST |
Responsibility for works: WELSH WATER |
Current status: Planned work about to start |
Works reference: PE12594685889 |
|
|
A494 A494 Wb County Boundary to River, Sealand, Flintshire |
19 November — 20 November |
Delays possible Lane closure |
Works location: A494 between junction Drome Corner and Queensferry Interchange, Sealand – Westbound Carriageway |
Works description: Carry out surface patch/crack repairs. Overnight works between 19:30hrs and 06:00hrs. Lane 2/3 closure. |
Responsibility for works: Welsh Government |
Current status: Planned work about to start |
Works reference: PD5011832082423322 |
|
|
A494 A494 Wb County Boundary to River, Sealand, Flintshire |
20 November — 21 November |
Delays possible Lane closure |
Works location: A494 between junction Drome Corner and Queensferry Interchange, Sealand – Westbound Carriageway |
Works description: Carry out surface patch/crack repairs. Overnight works between 19:30hrs and 06:00hrs. Lane 1 closure. |
Responsibility for works: Welsh Government |
Current status: Planned work about to start |
Works reference: PD5011832082240797 |
|
|
A55 A55 Eb Llyn Y Mawn to P Halkyn, Holywell, Flintshire |
19 November — 23 November |
Delays possible Lane closure |
Works location: A55, Llyn Y Mawn to Pentre Halkyn – Eastbound Carriageway |
Works description: Tree Maintenance Works – Overnight between 19:30hrs and 01:00hrs |
Responsibility for works: Welsh Government |
Current status: Planned work about to start |
Works reference: PD50118264102051677 |
|
|
|
|
|
|
Badgers Rake Lane, Little Sutton, Ellesmere Port, Cheshire West and Chester |
19 November — 23 November |
Delays possible Traffic control (two-way signals) |
Works location: Near the junction with A550 FROM J B5463 TO J A540 INCLUDING DUALLING on BADGERS RAKE LANE… |
Works description: HOOTON 572514 – TRAFFIC MANAGEMENT to facilitate BT Openreach Fibre Cabling Works … with no Excava… |
Responsibility for works: Openreach |
Current status: Advanced planning |
Works reference: BC006MU1WBAUNWIBW6JHEJ08 |
|
|
Bromfield Lane, Mold, Flintshire |
20 November — 27 November |
Delays possible Traffic control (two-way signals) |
Works location: NEAR TO JUNCTION OF QUEENS LANE |
Works description: Excavate in tar footway to locate and reapir cable fault |
Responsibility for works: SP ENERGY NETWORKS |
Current status: Planned work about to start |
Works reference: GY1182100233268A |
|
|
Chester Road, Penymynydd, Flintshire |
21 November — 04 December |
Delays possible Traffic control (two-way signals) |
Works location: JUNCTION OF TERRACE LANE TO SIDE OF CHESTER ROAD SERVICES ROAD |
Works description: EXCAVATE IN VERGE / CARRIDGEWAY INCLUDING ROAD CROSSINGS TO INSTALL NEW GAS MAINS TO SERVE HOUSING DEVELOPMENT |
Responsibility for works: E S Pipelines Ltd |
Current status: Planned work about to start |
Works reference: ZY038BU0103/01 |
|
|
High Street, Bagillt, Flintshire |
19 November — 20 November |
Delays possible Traffic control (multi-way signals) |
Works location: OUTSIDE TEMPERANCE HOUSE |
Works description: RENEW DEFECTIVE COVER & FRAME |
Responsibility for works: WELSH WATER |
Current status: Planned work about to start |
Works reference: PE12594743105 |
|
|
|