A5119 Chester Street, Mold, Flintshire |
30 June — 03 July |
Delays likely Traffic control (two-way signals) |
Works location: O/S Terrig House |
Works description: Service Relay Required – 8m Public 7m Private |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
A5119 Northop Road, Flint, Flintshire |
30 June — 29 August |
Delays likely Traffic control (multi-way signals) |
Works location: O/S No. 2 Northop Road – O/S No. 86 Northop Road. |
Works description: Replace 602m Of 4in Ci With 602m Of 63mm, 90mm Pe And Replace Or Transfer Approx 50 Services |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
A51 Boughton, Chester, Cheshire West And Chester |
29 June — 10 July |
Delays likely Lane closure |
Works location: Between 67 And Opposite 100 – Road Crossing Outside 67 |
Works description: Excavate Trench, Large Jointbays Both Low Voltage & High Voltage In Footway & Verge And Road Crossing In Carriageway, Open Cut, For Underground Electrical Service Connection For New Waitrose Store. Followed By A Permanent Reinstatement. |
Responsibility for works: SP Energy Networks |
Current status: Advanced planning |
|
|
|
|
Coed Onn Road, Flint, Flintshire |
30 June — 29 August |
Delays likely Road closure |
Works location: Junc Coed Onn Road/Northop Road – Junc Coed Onn Road/First Avenue. |
Works description: Road Closure For Works In Conjunction With Northop Road |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
|
|
Mount Pleasant Avenue, Flint, Flintshire |
30 June — 29 August |
Delays likely Road closure |
Works location: Junc Mount Pleasant Avenue/Northop Road – Junc Mount Pleasantavenue/First Avenue. |
Works description: Replace 76m Of 4in Ci With 76m Of 63mm Pe And Replace Or Transfer Approx 4 Services |
Responsibility for works: Wales & West Utilities Ltd |
Current status: Planned work about to start |
|
|
A5116 Liverpool Road, Chester, Cheshire West And Chester |
29 June — 02 July |
Delays possible Some carriageway incursion |
Works location: From Junction With A540 To Junction With Victoria Close, Liverpool Road |
Works description: Install 3x 100m Of Cable Into Existing Duct |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
A51 Boughton, Chester, Cheshire West And Chester |
30 June — 27 July |
Delays possible Some carriageway incursion |
Works location: Boughton – Outside 134 |
Works description: Scaffold Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Work in progress |
|
|
A55 |
30 June — 01 July |
Delays possible Lane closure |
Works location: A55, A55 / A483 East & Westbound. |
Works description: N – Overnight Lane Two Closed East & Westbound Due To Drainage Works |
Responsibility for works: Highways Agency |
Current status: Planned work about to start |
|
|
Auckland Road, Chester, Cheshire West And Chester |
30 June — 02 July |
Delays possible Traffic control (give & take) |
Works location: Blacon: Col: 1: At / Outside House House 3:; Laurence Scott |
Works description: Replace Concrete Column Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Saughall Road, Chester, Cheshire West And Chester |
30 June — 02 July |
Delays possible Traffic control (give & take) |
Works location: Blacon: Col: 71: Opposite House 202:; Laurence Scott |
Works description: Replace Concrete Column With 8mtr Tubular Column And 100w Arc Lantern Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Chichester Street, Chester, Cheshire West And Chester |
30 June — 29 July |
Delays possible Some carriageway incursion |
Works location: Chichester Street 29 Chester |
Works description: Application For A Skip Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Work in progress |
|
|
Evans Street, Flint, Flintshire |
30 June — 07 July |
Delays possible Traffic control (two-way signals) |
Works location: Opposite 22 |
Works description: Excavate To Locate & Repair Low Voltage Fault. Excavte 3 X Joint Bays & 3 Metre Trench |
Responsibility for works: SP Energy Networks |
Current status: Planned work about to start |
|
|
Melbourne Road, Chester, Cheshire West And Chester |
30 June — 02 July |
Delays possible Traffic control (give & take) |
Works location: Blacon: Col: 18: Near Of Houses 66/74:; Laurence Scott |
Works description: Replace Concrete Column Blacon |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|