ROADWORKS IN AND AROUND FLINTSHIRE STARTING: 6th March

News and Info from Deeside, Flintshire, North Wales

[followbutton username=’deesidedotcom’]

[dciframe]http://roadworks.org/,958,500,0,auto,border:1px dotted black;align:left;[/dciframe]

A494t A494 Pinfold Lane To Alltami Lgts, Alltami, Flintshire
07 March — 10 March
Delays likely Traffic control (Stop/Go boards)
Works location: Outside Elm Farm
Works description: Overhead Line Works Only – No Excavation Date Of Outage: 07/03/2014
Responsibility for works: Scottish Power
Current status: Planned work about to start

A5104 Corwen Road, Pontybodkin, Flintshire
07 March — 11 March
Delays likely Traffic control (two-way signals)
Works location: Works Outside ‘Cedron Chapel’ In Footway
Works description: Locate And Repair Leak At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start

A5116 Liverpool Road, Upton, Chester, Cheshire West And Chester
06 March — 10 March
Delays likely Traffic control (give & take)
Works location: Works Outside Number 98 In Footway
Works description: Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

A5268 City Road Gyratory, Chester, Cheshire West And Chester
07 March — 11 March
Delays likely Traffic control (give & take)
Works location: (Pcp26) 341135 366452 341109 366443 Side Of 134 To 128/126 Foregate Street On City Road Gyratory, Chester, Cheshire, Ch1
Works description: Install Ne Dslam And Lay Cables In Footparth
Responsibility for works: BT
Current status: Advanced planning

A541 A541 North Jct To Dual Alyn Bank, Pontblyddyn, Flintshire
06 March — 07 March
Delays likely Traffic control (two-way signals)
Works location: 3 Church Terrace, A541 North Jct To Dual Alyn Bank, Pontblyddyn
Works description: Desilt
Responsibility for works: Welsh Water
Current status: Planned work about to start

A550 Hawarden Road, Hope, Flintshire
06 March — 10 March
Delays likely Traffic control (two-way signals)
Works location: Jct Of B5373 To North Of Jct Kinnerton Rd On A550
Works description: Prove Bt Ducts
Responsibility for works: BT
Current status: Planned work about to start

A550 Wrexham Road, Hope, Flintshire
06 March — 10 March
Delays likely Traffic control (two-way signals)
Works location: Jct Of B5373 To North Of Jct Kinnerton Rd On A550
Works description: To Prove Bt Ducts
Responsibility for works: BT
Current status: Planned work about to start

A550 Wrexham Road, Hope, Flintshire
07 March — 11 March
Delays likely Traffic control (give & take)
Works location: In Verge From Approx 150mtrs North Of Hope View To Outside Greenacres, Wrexham Road
Works description: Locate And Excavate 2 Blockage In Existing Duct
Responsibility for works: BT
Current status: Planned work about to start

B5445 Wrexham Road, Pulford, Chester, Cheshire West And Chester
06 March — 10 March
Delays likely Traffic control (give & take)
Works location: Approximately 13.7 Mts From Rosemary House
Works description: Final Site Check Of Grass Verge Temp To Final Following – Lay New Water Main – Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Predestrain Access
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

Blacon Avenue, Chester, Cheshire West And Chester
07 March — 20 March
Delays likely Traffic control (two-way signals)
Works location: Footway Outside 72 To Outside 68 & Footway Opposite 52 Norris Road & Rear , Blacon Avenue
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Build 4 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 255m Of 1 Way Poly Duct In Footway,Install 36m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

A541 A541 North Jct To Dual Alyn Bank, Pontblyddyn, Flintshire
06 March — 10 March
Delays possible
Works location: 90 Metres Below Alyn Bank Cottages In Footway
Works description: Check Reinstatement Condition On Site Following – Repair 3″ Mains Leak Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start

A548 Sealand Road, Sealand, Flintshire
06 March — 06 March
Delays possible Traffic control (two-way signals)
Works location: O/S Brook Farm Sealand Road Sealand Chester Ch5 3pg
Works description: The Opening Of A Carriageway Structure To Allow Jointing Works To An Underground Telecoms Cable.
Responsibility for works: BT
Current status: Planned work about to start

A550 Wrexham Road, Hope, Flintshire
07 March — 13 March
Delays possible
Works location: Pcp3 Adjacent Yew Tree Farm House
Works description: Excavate 10 Metre Trench In Grass Verge
Responsibility for works: Scottish Power
Current status: Planned work about to start

A56 Hoole Road, Chester, Cheshire West And Chester
06 March — 07 March
Delays possible
Works location: Hoole: Col: 12: Nothing Adjacent 35 Meters Fro
Works description: Excavate Trial Hole For Nal Socket Hoole
Responsibility for works: Cheshire West And Chester Council
Current status: Advanced planning

Alltami Road, Alltami, Flintshire
07 March — 10 March
Delays possible Traffic control (Stop/Go boards)
Works location: From Outside Penheath To The Grange
Works description: Overhead Line Works Only – No Excavation Date Of Outage: 07/03/2014
Responsibility for works: Scottish Power
Current status: Planned work about to start

Eastgate Street, Chester, Cheshire West And Chester
07 March — 11 March
Delays possible
Works location: Outside No 60 Near Eastgate Clock To Outside No 52 Eastgate Street
Works description: Install Telecoms Duct And Construct Footway Chamber- Footway Works – Will Work Between 9:00am And 5:00pm
Responsibility for works: Vodafone Group
Current status: Advanced planning

Halton Road, Upton, Chester, Cheshire West And Chester
07 March — 11 March
Delays possible Traffic control (give & take)
Works location: Works Outside Numbers 54 / 56 In Footway
Works description: Final Site Check Of Grass Verge Temp To Final Following – Rebuild Defective Chamber At Boundary (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

Highmere Drive, Connahs Quay, Flintshire
07 March — 10 March
Delays possible Traffic control (give & take)
Works location: 23 Highmere Drive, Connahs Quay
Works description: House Hold Meter Option – Fit
Responsibility for works: Welsh Water
Current status: Planned work about to start

Kinnerton Road, Higher Kinnerton, Flintshire
06 March — 10 March
Delays possible Traffic control (two-way signals)
Works location: 30m Below Middle Lane Junction In Existing Chamber In Verge
Works description: Install 80mm Strainer In Existing Chamber – Notice For Two Way Lights Only To Maintain Safe Digging Practices (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start

M56
06 March — 07 March
Delays possible Lane closure
Works location: M56, M56 Jct 16-15 East & Westbound.
Works description: N -Overnight Lane Three Closed East & Westbound Due To Barrier Repair
Responsibility for works: Highways Agency
Current status: Planned work about to start

Ochr Y Foel From Wern Y Gaer Jct To B5123 Jct Inc Link Adj To Church, Rhosesmor, Flintshire
06 March — 07 March
Delays possible Traffic control (two-way signals)
Works location: From The Junction With Bryn Y Foel To Tan Yr Enfys
Works description: 2 X Overhead Line Pole Replacement
Responsibility for works: Scottish Power
Current status: Planned work about to start

Ochr Y Foel From Wern Y Gaer Jct To B5123 Jct Inc Link Adj To Church, Rhosesmor, Flintshire
06 March — 07 March
Delays possible Traffic control (multi-way signals)
Works location: From The B5123 To The Junction With St Paul’S Church
Works description: Overhead Line Works Only – No Excavation
Responsibility for works: Scottish Power
Current status: Planned work about to start

Ochr Y Foel From Wern Y Gaer Jct To B5123 Jct Inc Link Adj To Church, Rhosesmor, Flintshire
06 March — 10 March
Delays possible Traffic control (multi-way signals)
Works location: From Hafan To 70 Metres Northwest Of Glenville
Works description: Overhead Line Works, Replace Stay, Install New Service And Extend Pole
Responsibility for works: Scottish Power
Current status: Planned work about to start

The Groves, Chester, Cheshire West And Chester
06 March — 17 March
Delays possible
Works location: Opposite Bithell’S Boats, Near To The Junction Of Souters Lane
Works description: Excavate To Standard Depth, Open Cut In Footway Jointbay And 3m Track For Underground Electrical Service Connection. Followed By A Permanent Reinstatement.
Responsibility for works: Scottish Power
Current status: Advanced planning

More...

Senedd shoots down outdoor education bill

News

UK shoppers misled by some origin labelling on food in supermarkets, claims Which?

News

Survey shows strong support for schools’ role in children and young people’s health and wellbeing

News

Give young people nicotine patches and gum to help them quit vaping, says PHW

News

Almost one in five people in Wales waiting to start NHS treatment

News

Newly named Trials Day to open up Chester Racecourse season at Boodles May Festival

News