Posted: Wed 26th Feb 2014

Roadworks In And Around Flintshire starting from 26/02/14

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Wednesday, Feb 26th, 2014

[followbutton username=’deesidedotcom’]

Roadworks In And Around Deeside from 26/02/14

Chester Road : long term roadworks – Click Here for more


King George Street, Shotton, Flintshire
26 February — 28 February
Delays possible
Works location: Zzdig, In Footway Opposite 25, King George Street
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Planned work about to start


B5126 Connahs Quay Road, Northop, Flintshire
27 February — 28 February
Delays possible Traffic control (Stop/Go boards)
Works location: B5126 Flyover/J33a A55
Works description: Overhead Line Work
Responsibility for works: Scottish Power
Current status: Planned work about to start


 

Boundary Lane, Saltney, Flintshire
26 February — 28 February
Delays possible
Works location: Works Outside Number 116 In Footway
Works description: Carry Out Flow And Pressure Test At Boundary And Insert Meterfit At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Planned work about to start


 

A55
26 February — 27 February
Delays possible Lane closure
Works location: A55, A55 J36 – 35 Westbound.
Works description: Night Time Lanes 1 & 2 Westbound For Slot Cutting
Responsibility for works: Highways Agency
Current status: Planned work about to start


A5119 Northop Road, Northop, Flintshire
27 February — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: Outside Shadybrook Opposite The Cricket Ground
Works description: Overhead Line Work. Outage 27/02/14
Responsibility for works: Scottish Power
Current status: Planned work about to start

B5127 Liverpool Road, Buckley, Flintshire
26 February — 28 February
Delays likely Traffic control (two-way signals)
Works location: 105m North East Of Bowling Green, Liverpool Road, Buckley
Works description: Install New Ocnnection With Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start

Bumpers Lane, Chester, Cheshire West And Chester
27 February — 28 February
Delays likely Lane closure
Works location: Jnc Bumpers Lane/Sealand Road Chester Cheshire Ch1 4ps
Works description: Access Required Into A Carrageway Box Which Is Located On The Traffic Lights On Bumpers Lane To Allow Jointing Works To Be Carried Out To Provide Service. One Nights Working
Responsibility for works: BT
Current status: Advanced planning

Bumpers Lane, Chester, Cheshire West And Chester
27 February — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: In Footway Junction Of Hartford Way To Junction Of Sealand Road On Bumpers Lane, Chester, Ch1 4lt, B
Works description: Install 29m Of 1 Way Poly Duct In Carriageway,Install 81m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Ffordd Pen Y Bryn, Nercwys, Flintshire
26 February — 28 February
Delays likely Road closure
Works location: Opp 4 School Terrace, Ffordd Pen Y Bryn, Nercwys, Mold
Works description: Install New Connetion With Excavation
Responsibility for works: Welsh Water
Current status: Planned work about to start


 

Coed Onn Road, Flint, Flintshire
27 February — 07 March
Delays possible Traffic control (two-way signals)
Works location: Outside 96, Coed Onn Road
Works description: Install 24m Of 1 Way Poly Duct In Footway,Provide 1 Provide/Recover 1 Nga Cab And Base (1.5m X 0.5m)
Responsibility for works: BT
Current status: Planned work about to start

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com
Latest News

  • Senedd passes Bill to simplify consenting process for major infrastructure projects in Wales
  • Wales Wildfire Board launches new ‘WildfireWise’ awareness campaign
  • MS welcomes ‘enthusiastic’ Flintshire pupils to the Senedd

  • More...

    Senedd passes Bill to simplify consenting process for major infrastructure projects in Wales

    News

    Wales Wildfire Board launches new ‘WildfireWise’ awareness campaign

    News

    MS welcomes ‘enthusiastic’ Flintshire pupils to the Senedd

    News

    Flintshire wins share of £100m Welsh Government transport and active travel improvement funding

    News

    Check if your business is eligible to benefit from grants to help reduce running costs

    News

    Flint Air Cadets Showcase Skills to Civic Leaders

    News

    Plans for 25-bedroom dementia unit at a Flintshire care home given green light.

    News

    Former landlord of Deeside pub sentenced to 24 years in prison for rape and sexual assault

    News

    Lidl set to open new Connah’s Quay store in December

    News