A548 Chester Street, Flint, Flintshire |
04 March — 07 March |
Delays likely Traffic control (give & take) |
Works location: In Footway Outside 80 Chester Road, Flint Ch6 5du |
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A549 Brunswick Road, Buckley, Flintshire |
03 March — 04 March |
Delays likely Traffic control (multi-way signals) |
Works location: Roman Catholic Presbytery, Brunswick Road, Buckley |
Works description: Renew Stop Tap |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
A550 Hawarden Road, Caergwrle, Flintshire |
03 March — 05 March |
Delays likely Traffic control (multi-way signals) |
Works location: In Footway/Carriageway From Outside Tynewydd To Opposite 30 Hawarden Road , Hawarden Road |
Works description: Locate And Excavate 2 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A56 Hoole Road, Chester, Cheshire West And Chester |
03 March — 04 April |
Delays likely Traffic control (give & take) |
Works location: Hoole: Col: 39: At Dene Hotel |
Works description: Install Mini Pillar For New Pedestrian Crossing Supply – 365795, 373571. Hoole |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
B5129 Chester Road, Sandycroft, Flintshire |
03 March — 05 March |
Delays likely Traffic control (two-way signals) |
Works location: Verge, Opposite 18 Chester Road |
Works description: Install 1 Plinth(S) For New Box In Carriageway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B5130 Chester Road, Huntington, Chester, Cheshire West And Chester |
03 March — 05 March |
Delays likely Traffic control (give & take) |
Works location: Works Outside Number 164 |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Locate Service And Install Meterfit At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passageway For Pedestrians) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
B5441 Station Road, Queensferry, Flintshire |
04 March — 05 March |
Delays likely Traffic control (two-way signals) |
Works location: In The Area Of The Bridge-From 45 Metres To 90 Metres North East Of The Junction With Dundas Street |
Works description: Half Road Closure With 2 Way Lights And Footpath Closure Required For Additional Works 04/03/2014 – 2000 05/03/2014 – 0600 (1 Night Shift) |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
|
Bumpers Lane, Chester, Cheshire West And Chester |
03 March — 04 March |
Delays likely Traffic control (two-way signals) |
Works location: Junction Of Hartford Way & Bumpers Lane, Chester, Cheshire West And Chester |
Works description: Section 81 |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
Kilmorey Park, Chester, Cheshire West And Chester |
03 March — 07 March |
Delays likely Road closure |
Works location: 10 Kilmorey Park, Chester |
Works description: Dig Down To Repair Dropped Manhole |
Responsibility for works: Welsh Water |
Current status: Advanced planning |
|
|
Lower Mountain Road, Penyffordd, Flintshire |
03 March — 07 March |
Delays likely Road closure |
Works location: Near Wwtw |
Works description: Gravity Sewer Installation |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Marshlands Road, Little Neston, Neston, Cheshire West And Chester |
03 March — 10 March |
Delays likely Traffic control (two-way signals) |
Works location: Outside Property Named Bridge Bungalow |
Works description: Lay 20m New Service Of Which 7m Will Be In Public To Main In Carriageway |
Responsibility for works: National Grid Gas Plc |
Current status: Advanced planning |
|
|
A483 Wrexham Road, Chester, Cheshire West And Chester |
04 March — 06 March |
Delays possible |
Works location: Near La Fitness Club |
Works description: 2m Of Footway Works – Will Work Between 9:30am And 3:30pm |
Responsibility for works: Vodafone Group |
Current status: Advanced planning |
|
|
A5104 Corwen Road, Pontybodkin, Flintshire |
04 March — 06 March |
Delays possible |
Works location: Carriageway Junction Of Tir Y Fron Lane To Outside Nant House On Corwen Road, Corwen Road |
Works description: Locate And Excavate 4 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
A540 Parkgate Road, Chester, Cheshire West And Chester |
03 March — 14 March |
Delays possible |
Works location: Sign S13 Junction With Walpole Street Chester |
Works description: ‘Removal Of Electricity Supply From Redundant Street Furniture And The Installation Of Supply To Replacement Street Furniture. ‘ ‘The Excavation And Reinstatement Of The Footway For The Connection Of Electrical Supply To Street Furniture.’ |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
B5123 B5123 Church Jct To Nant Jct, Rhosesmor, Flintshire |
03 March — 05 March |
Delays possible Traffic control (multi-way signals) |
Works location: From Outside Orsedd To 55 Metres North Of The Red Lion Inn |
Works description: Install 2 New Services And 2 New Brackets |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Overleigh Road, Chester, Cheshire West And Chester |
03 March — 10 March |
Delays possible |
Works location: Overleigh Road Outside 36 |
Works description: Scaffold Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Work in progress |
|
|
Cornist Drive, Flint, Flintshire |
04 March — 05 March |
Delays possible Traffic control (give & take) |
Works location: 18 Cornist Drive, Flint, Flintshire |
Works description: Household Meter Option – Fit |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Dee Road, Connahs Quay, Flintshire |
03 March — 04 March |
Delays possible Traffic control (give & take) |
Works location: 109 Dee Road, Connahs Quay |
Works description: House Hold Meter Option – Fit |
Responsibility for works: Welsh Water |
Current status: Planned work about to start |
|
|
Eastgate Street, Chester, Cheshire West And Chester |
04 March — 06 March |
Delays possible |
Works location: From Outside Number 60 To Outside Number 22-24 |
Works description: Clear Blockages- Will Work Between 9:00am And 5:00pm |
Responsibility for works: Vodafone Group |
Current status: Advanced planning |
|
|
|
|
Garden Lane, Chester, Cheshire West And Chester |
03 March — 07 March |
Delays possible |
Works location: Garden Lane Outside 51 The Bouverie Ph |
Works description: Section 50 Licence |
Responsibility for works: Cheshire West And Chester Council |
Current status: Advanced planning |
|
|
Halkyn Street, Flint, Flintshire |
03 March — 05 March |
Delays possible Traffic control (give & take) |
Works location: Footway, Side Of 68, Halkyn Street |
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 2m Of 3 Poly Ducts In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
Halton Road, Upton, Chester, Cheshire West And Chester |
04 March — 06 March |
Delays possible Traffic control (give & take) |
Works location: Works Adjacent To Number 3 Shipbrook Road In Grass Verge |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Locate Service And Install Stop Tap At Boundary (Traffic Management In Accordance With Chapter 8 Including Maintaining A Safe Passageway For Pedestrians) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
Hartington Street, Chester, Cheshire West And Chester |
03 March — 05 March |
Delays possible Traffic control (give & take) |
Works location: In Footway Outside 13/15 Hartington Street, Hartington Street |
Works description: Replace 1 Existing Pole 0.5m X 0.5m |
Responsibility for works: BT |
Current status: Advanced planning |
|
|
Newhall Road, Chester, Cheshire West And Chester |
04 March — 06 March |
Delays possible Traffic control (give & take) |
Works location: Works Outside Number 4 Church View In Grass Verge |
Works description: Final Site Check Of Grass Verge Temp To Final Following – Install Meter At Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passageway For Pedestrians) |
Responsibility for works: Dee Valley Water Plc |
Current status: Advanced planning |
|
|
One Way Link From B5123 Jct Opp Red Lion, Rhosesmor, Flintshire |
03 March — 05 March |
Delays possible Traffic control (multi-way signals) |
Works location: From The Junction With The B5123 To The Junction With Wern Road |
Works description: Replace Stay, Extend Overhead Line Pole Height, Install New Service And Bracket |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|
Rake Way, Saughall, Chester, Cheshire West And Chester |
03 March — 14 March |
Delays possible Traffic control (two-way signals) |
Works location: Number 52 To New Site Entrance |
Works description: 7- 1.5 X 1.5metres Joint Bays To Install Multi Utility Services To New Houses |
Responsibility for works: GLOBAL UTILITY CONNECTIONS |
Current status: Advanced planning |
|
|
Vownog Newydd Jct To The Red House Jct, Soughton, Flintshire |
04 March — 05 March |
Delays possible Traffic control (Stop/Go boards) |
Works location: From Tai-Cochion To Glan-Ygors |
Works description: Overhead Line Works Only – No Excavation Date Of Outage: 04/03/2014 |
Responsibility for works: Scottish Power |
Current status: Planned work about to start |
|
|