Posted: Mon 6th Jan 2014

Roadworks In And Around Deeside starting from 06/01/14

News and Info from Deeside, Flintshire, North Wales
This article is old - Published: Monday, Jan 6th, 2014

Roadworks In And Around Deeside from 19/12/13


A41 Whitchurch Road, Christleton, Chester, Cheshire West And Chester
07 January — 09 January
Delays likely Traffic control (two-way signals)
Works location: Opp 99 Whitchurch Road, Christleton, Chester
Works description: Renew/Reset Defective Manhole Cover
Responsibility for works: Welsh Water
Current status: Advanced planning

A51/A5115 Christleton Road, Chester, Cheshire West And Chester
07 January — 09 January
Delays likely Traffic control (give & take)
Works location: Works Outside Number 28 In Footway
Works description: Carry Out New Connection From Meterfit To Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

A5115 Whitchurch Road, Great Boughton, Chester, Cheshire West And Chester
07 January — 09 January
Delays likely Traffic control (two-way signals)
Works location: 41-43 Whitchurch Road, Great Broughton
Works description: Renew Frame & Cover Of Manhole
Responsibility for works: Welsh Water
Current status: Advanced planning

A5115 Whitchurch Road, Great Boughton, Chester, Cheshire West And Chester
07 January — 09 January
Delays likely Traffic control (multi-way signals)
Works location: 38b Whitchurch Roadm, Great Broughton, Chester
Works description: Renew Manhole Frame & Cover
Responsibility for works: Welsh Water
Current status: Advanced planning

A525 Llanfair Road, Ruthin, Denbighshire
07 January — 09 January
Delays likely Traffic control (give & take)
Works location: O/S Maesmor, Llanfair Road, Ruthin…
Works description: Renew Stop Tap
Responsibility for works: Welsh Water
Current status: Advanced planning

A525 Upper Denbigh Road, St Asaph, Denbighshire
06 January — 07 January
Delays likely Traffic control (give & take)
Works location: Bron Yr Aur
Works description: Replace Temporary Reinstatement With Permanent…
Responsibility for works: Wales & West Utilities Ltd
Current status: Planned work about to start

A5268 Foregate Street, Chester, Cheshire West And Chester
06 January — 22 January
Delays likely Lane closure
Works location: Chester: Love St To Old Queens Head: Love Street And Foregate Street To City Road Gyratory And Bath Street
Works description: Concrete Flags To Yorkstone Flags Cheste
Responsibility for works: Cheshire West And Chester Council
Current status: Advanced planning

A543 High Street, Denbigh, Denbighshire
06 January — 08 January
Delays likely Traffic control (Stop/Go boards)
Works location: 51-53 High Street, Denbigh…
Works description: Renew Frame And Cover…
Responsibility for works: Welsh Water
Current status: Advanced planning

A547 Gronant Road, Prestatyn, Denbighshire
07 January — 08 January
Delays likely Traffic control (two-way signals)
Works location: Ta/ Os 11 & 13
Works description: Adnewyddu Polyn / Renew Pole…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning

A547 Gronant Road, Prestatyn, Denbighshire
07 January — 09 January
Delays likely Traffic control (two-way signals)
Works location: In Footway Outside 11/13 Gronant Road, Gronant Road…
Works description: Replace 1 Existing Pole 0.5m X 0.5m…
Responsibility for works: BT
Current status: Advanced planning

A548 A548 Isglan Jct To B5121 Jct, Greenfield, Flintshire
07 January — 08 January
Delays likely Traffic control (two-way signals)
Works location: Coed Mawr Cottage To Cottage Garage
Works description: X 1 Pole Change
Responsibility for works: Scottish Power
Current status: Planned work about to start

A548 Marine Road, Prestatyn, Denbighshire
06 January — 07 January
Delays likely Traffic control (two-way signals)
Works location: Amryw O Safleoedd/ Various Locations…
Works description: Adnewyddu Ffram A Cyfar/ Renew Frame & Cover…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning

A548 Marine Road, Prestatyn, Denbighshire
06 January — 08 January
Delays likely Traffic control (Stop/Go boards)
Works location: 102 Marine Road, Prestatyn…
Works description: Renew Frame And Cover…
Responsibility for works: Welsh Water
Current status: Advanced planning

A548 Marine Road, Prestatyn, Denbighshire
07 January — 08 January
Delays likely Traffic control (give & take)
Works location: O/S 1
Works description: Repairs To Defective Reinstatement (Wwu Ref:12729 )…
Responsibility for works: Wales & West Utilities Ltd
Current status: Planned work about to start

A548 Sealand Road, Chester, Cheshire West And Chester
07 January — 09 January
Delays likely Traffic control (give & take)
Works location: Works Outside Number 190 In Footway
Works description: Replace Communication Pipe From Main To Boundary (Traffic Management In Accordance With Chapter Eight Including Maintaining A Safe Passage For Pedestrian Access)
Responsibility for works: Dee Valley Water Plc
Current status: Advanced planning

A548 Victoria Road West, Prestatyn, Denbighshire
07 January — 10 January
Delays likely Traffic control (give & take)
Works location: O/S No.117
Works description: Service Relay – 4m Public 6m Private…
Responsibility for works: Wales & West Utilities Ltd
Current status: Advanced planning

A548 Wellington Road, Rhyl, Denbighshire
07 January — 10 January
Delays likely Traffic control (two-way signals)
Works location: 155
Works description: Gwaith Nwy / Gas Works…
Responsibility for works: Denbighshire County Council
Current status: Advanced planning

A548 Wellington Road, Rhyl, Denbighshire
07 January — 10 January
Delays likely Traffic control (two-way signals)
Works location: O/S No.155
Works description: Lay New Service – 5m Public 13m Private…
Responsibility for works: Wales & West Utilities Ltd
Current status: Advanced planning

A550 Hawarden Road, Caergwrle, Flintshire
06 January — 07 January
Delays likely Traffic control (two-way signals)
Works location: Opp Lyndhurst, Hawarden Road, Caergwrle
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

A550 Hawarden Road, Hope, Flintshire
06 January — 07 January
Delays likely Traffic control (two-way signals)
Works location: Bridge End Cottage, Hawarden Road, Hope
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

A550 Hawarden Road, Hope, Flintshire
06 January — 07 January
Delays likely Traffic control (multi-way signals)
Works location: Hawarden Road Junction Of Castle Street, Caergwrle, Ll12 9ds
Works description: Renew Frame And Cover
Responsibility for works: Welsh Water
Current status: Planned work about to start

[dciframe]http://roadworks.org/,610,600,0,no,border:0px solid blue;align:left;[/dciframe]

Spotted something? Got a story? Send a Facebook Message | A direct message on Twitter | Email: News@Deeside.com
Latest News

  • What will the weather look like over Easter?
  • Man sentenced for two counts of rape which took place in Chester 20 years ago
  • North Wales’ NHS service ‘nowhere near good enough’ admits Betsi boss

  • More...

    What will the weather look like over Easter?

    News

    Man sentenced for two counts of rape which took place in Chester 20 years ago

    News

    North Wales’ NHS service ‘nowhere near good enough’ admits Betsi boss

    News

    Chester Zoo reintroduces one of world’s rarest plants into mystery Welsh location to help save it from extinction

    News

    Operation Darwin: Campaign aimed at reducing risk of motorcycle-related deaths launched in North Wales

    News

    Man who raped a teenager at a campsite near Chester jailed.

    News

    DECA Sealand industrial action ends after union secures improved pay deal.

    News

    MPs’ call for ‘modest’ increase in statutory sick pay

    News

    10m homes should read their energy meter this weekend

    News